Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

11th Avenue and Indian School Road
Term Contract
Post-Bid
Parker, AZ

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Results
Prescott, AZ 86301

Seeking Sources for Installation of New Gate and Erosion Control for Tactical Communications Tower (TACCOM) Near Araz-Wintergate, AZ
Term Contract
Post-Bid
$20,000 to $50,000 est. value

Road Maintenance 2021 Project
Infrastructure
Results
$1,290,250 est. value
Parker, AZ

Type 3 Slurry Seal and Open Grade Slurry Seal
Infrastructure
Post-Bid
Parker, AZ

Pavement Preservation
Infrastructure
Results
$2,000,000 est. value
AZ

Bouse Elementary School Grading and Drainage Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Bouse, AZ 85325

Y--La Posa LTVA Sites Road Repaving FY22
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Quartzsite, AZ

Riverside Drive Mill and Overlay Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Parker, AZ 85344

Quartzsite-Parker-Topock Highway (SR 95) (Chemehuevi Ave-beacon Road)
Infrastructure
Results
$2,000,000 est. value
AZ

State Line to Riverside Drive (SR 95 Spur, State Line - River)
Infrastructure
Results
$750,000 est. value
Parker, AZ 85344

BDWID Water System Improvements (Re-Bid)
New Construction, Infrastructure
Results
$5,695,663 CJ est. value
Bouse, AZ 85325

Last Updated 02/28/2023 10:28 AM
Project Title

Riggles Avenue and Mockingbird Street - Asphalt Mill and Overlay Project

Physical Address View project details and contacts
City, State (County) Quartzsite, AZ 85346   (La Paz County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $385,810 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 28, 2023, the project has been awarded. A timeline for construction have not been confirmed. All questions relating to the bid must be submitted in writing to Emmett Brinkerhoff, Public Works Director, (928) 927-4333, ebrinkerhoff@quartzsiteaz.org, with a copy to Nicole Collier, (928) 927-4333 x 200, ncollier@quartzsiteaz.org, Public Works Department, PO Box 2812, 580 East Quail Trail, Quartzsite, AZ 85346, referencing this IFB prior to the April 19, 2022, bidder questions deadline indicated on the Bidding Procedure Timetable. The contractor shall bear all risks associated with delays in the US mail or delivery service. Any requests received after the stated deadline may not be considered. All requests received prior to the deadline will be responded to in writing by the Town in the form of an addendum addressed and sent to all registered plan holders. Bid Security in the amount of not less than ten percent (10%) of the total Bid must accompany each Bid Form in the type and form specified in these Bid/Contract Documents. The Owner reserves the right to reject any and all Bids, to waive any informalities and minor irregularities in bids, and to accept the Bid deemed in the opinion of the Town of Quartzsite to be in the best interest of the Town. A conditional or qualified Bid may be cause for rejection. A Performance Bond and a Labor and Materials Bond, each in the amount of 100 percent (100%) of the Contract Price, with a corporate surety approved by the Contracting Agency, will be required for the faithful performance of the Contract. Attorneys-in-Fact who sign Bid Bonds or Performance Bonds or Labor and Material Payment Bonds must file with each Bond a certified and effective dated copy of their Power of Attorney. Within fourteen (14) calendar days of receipt of acceptable proof of insurance, W-9 form, Performance Bond, Labor and Materials Bond, any other required documents, and an Agreement signed by the party to whom the Agreement was awarded, the Owner shall sign the Agreement and return to such party a fully executed duplicate of the Agreement. Should the Owner not execute the Agreement within such period, the Bidder may, by Written Notice, withdraw the signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the Owner. The Town of Quartzsite will ensure that disadvantaged business enterprises (DBEs) will be afforded full opportunity to submit bids and proposals to all invitations. The Town of Quartzsite reserves the right to reject any or all bids, to waive irregularities of information in any bid, to re-advertise the bid, and/or take any steps determined prudent in order to resolve the protest. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents