Similar Projects
Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

I-44 - Utilities
Infrastructure
Design
$2,074,299 CJ est. value
Tulsa, OK 74145

Intersection Modification and Traffic Signals City Street (South Memorial Drive)
Infrastructure
Bidding
$886,711 CJ est. value
Tulsa, OK 74133

Joint Seal/Repair US-60 / US-64 / SH-51 WB / SH-66
Infrastructure
Bidding
$500,000 CJ est. value
Tulsa, OK 74104

Gathering Place for Tulsa East Bank - Phase II - Bid Package #2
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Tulsa, OK 74103

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

FY '22 Water Pollution Control Capital Equipment Replacements
Alteration
Post-Bid
Tulsa, OK

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Construction
$38,982,295 CJ est. value
Tulsa, OK 74108

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

The Enclave at Southern Trails
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Broken Arrow, OK 74011

LaFortune Park Splash Pad - Tulsa County
Infrastructure
Conception
$550,000 CJ est. value
Tulsa, OK 74135

Last Updated 10/12/2022 08:40 AM
Project Title

Raw Water Building Debris Auger Removal at Mohawk Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74115   (Tulsa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all tools, materials and labor and performing the work necessary to be done in the construction of the following: PROJECT NO. TMUA-W 20-41 RAW WATER BUILDING DEBRIS AUGER REMOVAL AT MOHAWK WATER TREATMENT PLANT The entire cost of the improvement shall be paid from Account No. 7403325-542710 Bids will not be received from contractors who did not attend the Pre-Bid Conference. Bids will be accepted by the City Clerk from the holder of valid prequalification certificates from the City of Tulsa in one or more of the following classifications: Attention is called to Resolution No. 18145 of August 23, 1988, requiring bidders to commit to the goal of employing on the project at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each employment classification. Attention is called to Resolution 7404 of November 8, 2006, requiring bidders, their subcontractors and their lower-tier subcontractors to hire only citizens of the United States. The Authority, acting on behalf of the City of Tulsa, is exempt from the payment of any sales or use taxes, and pursuant to Title 68 O.S. Section 1356(10), direct vendors to the Authority are also exempt from those taxes. A bidder may exclude from his bid appropriate sales taxes which he will not have to pay while acting for and on behalf of the Tulsa Metropolitan Utility Authority. See Contract Article IIB. A Certified or Cashier's Check or Bidder's Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; Performance, Statutory, and Maintenance bonds acceptable to the Authority, in conformity with the requirements of the proposed contract documents. The Performance, Statutory, and Maintenance bonds shall be for one hundred percent (100%) of the contract price. All bids will be opened and considered by the Bid Committee of said City at a meeting of said Committee to be held in the City Council Room of City Hall, 175 E. 2nd Street, in said City at 9.00 am_ on the 12th day of August 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents