Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

Pearl Street Sidewalk Reconstruction
Bidding
Johnson, VT 05656

Waterville Elementary School Parking Lot Resurfacing
Bidding
Waterville, VT 05492

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

Sidewalk Replacement Fair Haven Rest Area
Results
Fair Haven, VT

2021 Sidewalk Improvements
Bidding
Springfield, VT

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts –Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Vermont Route 7 Milton Streetscape Project - South
Results
$324,720 est. value
Milton, VT

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Design and Construction of Foot Trail at Taconic Mountain Ramble State Park
Results
$25,000 est. value
Hubbardton, VT 05743

Concrete Sidewalk Installation
Post-Bid
Rutland, VT 05702

Last Updated 10/08/2020 08:36 AM
Project Title

Keeler Bay Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) South Hero, VT   (Grand Isle County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Create a new parking area at the Keeler Bay Fishing Access Area off of US Rt 2 in South Hero, VT. Currently there is an existing gravel parking area along the shore of Lake Champlain. This new parking area will be caddy-corner to the existing lot and will be approximately 80 ft x 130 ft. Generally, the project will require the site to be cleared of shrubs and topsoil, installation of new or cleaning of existing ditching, and placement of reinforcement fabric, crushed gravel, and aggregate surface course. All work will not be able to begin prior to October 21 (town permits pending) and MUST be completed prior to November 25

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents