Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Bella Lane North Connector - Vitruvian Park Public Infrastructure, Phase 6, Block 300
Infrastructure
Bidding
Addison, TX

PGBT at Spur 303 Drainage and MSE Wall Improvements
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Grand Prairie, TX

Erosion Control at Various Locations - Phase 2
Post-Bid
Dallas, TX

Windsor Ridge Wall Repair
Alteration
Post-Bid
Irving, TX

Barnes Bridge Road Slope Protection
Results
Sunnyvale, TX 75182

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Bottleneck Improvements Package 1
Infrastructure
Bidding
$4,160,000 est. value
Garland, TX

Nantucket Branch Channel Improvements
Infrastructure
Post-Bid
$812,000 est. value
Richardson, TX 75081

Erosion Control and Storm Drainage Improvements Part I
Results
Dallas, TX 75201

Pioneer Drainage Improvements Phase I and Phase II
Infrastructure
Post-Bid
Irving, TX

Erosion Control at Various Locations - Phase 1
Results
$4,522,689 est. value
Dallas, TX 75201

O'Connor Ridge Boulevard Drainage Improvements
Infrastructure
Post-Bid
Irving, TX 75059

Irving Flood Control District Section III Valley Ranch Sump Shoreline Improvements
Results
Irving, TX 75014

Redding Trail Drainage and Amenity Improvements
Infrastructure
Post-Bid
Addison, TX 75001

Reported 03/02/2022 12:00 AM
Project Title

2020 Erosion Repair

Physical Address View project details and contacts
City, State (County) Richardson, TX   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from Municipal Agency - 02/07/22
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the following erosion repairs at three different sites of the west cottonwood creek within the City of Richardson, Texas: Site 1 - Arapaho - The concrete rip rap will be replaced with a gabion wall and gabion mattress on the slope. Site 2 - Waterview - Vegetation will be removed from the existing wall. The failed grouted wall at the downstream end of the existing wall will be removed. The existing gabion wall will be extended at the downstream end, and toe and end protection will be placed in the downstream end. Site 3 - West Shore - The toe protection will be removed and replaced for the full length of the wall. The upstream end of the wall will be protected. The failed grouted masonry retaining wall will be removed. Existing gabion wall will be extended, and toe and end protection will be placed in the downstream end.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents