Similar Projects
Installation of HVAC Systems
Bidding
Hustonville, KY 40437

Mechanical HVAC – Boiler Replacement
Bidding
Stanford, KY 40484

HVAC Filters
Post-Bid
KY

PHS HVAC Replacement Units
Post-Bid
Falmouth, KY 41040

HVAC Preventative Maintenance
Results
Fort Wright, KY

Conner High School HVAC Improvements
Results
Hebron, KY

Carrier I-VU HVAC Control System
Post-Bid
Fort Wright, KY

Ockerman Elementary School HVAC Upgrades
Results
Florence, KY 41042

HVAC Service
Term Contract
Post-Bid
Fort Mitchell, KY 41017

Reiley Elementary School Gymnasium AC
Results
KY

Sawyer Hayes Conference Center Chiller Replacement
Renovation
Post-Bid
Less than $434,149 est. value
Louisville, KY 40241

Boone County Schools Geothermal Upgrades
Results
KY

Fire Department Vehicle Exhaust Extraction System
Post-Bid
Fort Mitchell, KY 41017

Cooling Tower Replacement
Results
Burlington, KY 41005

Hazelwood HVAC System Replacement
Post-Bid
Less than $48,000 est. value
Louisville, KY

Last Updated 02/12/2021 04:51 AM
Project Title

COT Building HVAC Replacement and Repair

Physical Address View project details and contacts
City, State (County) Frankfort, KY   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $899,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This scope of work is intended to modernize and improve the Commonwealth Office of Technology’s mechanical systems and associated systems with the intention of providing an effective and operable system for the next 40 years of operation in the building. The project is centered around demolition of existing pneumatic controls and air terminal devices and replacing with modern digital controls and variable air volume air terminal units. Additional necessary upgrades and replacements will occur at the primary system air handling units including equipment replacement and controls upgrades. Additional work in this scope includes replacement of ceiling systems on the first and second floor to provide for improved service access to mechanical equipment, new light fixtures in the new ceiling system and adjusted fire protection sprinkler system piping to meet new architectural ceiling requirements.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents