Similar Projects
Uninterruptible Power Supply (UPS)
Bidding
Dallas, TX 75214

Radio Tower Lighting Maintenance and Repair
Term Contract
Post-Bid
McKinney, TX 75071

Uninterruptible Power Supply Replacement
Post-Bid
TX 75071

PISD Marquee Replacement
Results
$207,876 est. value
Prosper, TX 75078

Flow Meter Replacement Stacy #1 & 2 and Custer #1
Results
Allen, TX 75002

Wylie Water Treatment Plant High Service Pump Station 2-1 2016 Electrical Improvements Phase II
Post-Bid
Wylie, TX 75098

Medical Examiner Office Exterior Lighting
Results
$7,474 est. value
McKinney, TX 75069

Courtyard Theatre Performance Lighting Upgrade
Post-Bid
$440,000 est. value
Plano, TX 75074

Athletic Light Bulb Replacement and Repair Services
Term Contract
Results
$15,740 est. value
Allen, TX 75002

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Installation of Illumination and DMS Rehabilitation
Results
Less than $1,660,079 est. value
TX

Uninterruptible Power Supply Replacement
Post-Bid
Less than $165,000 est. value
McKinney, TX

Parking Lot LED Lighting Upgrades Multiple Sites
Results
$500,000 est. value
Plano, TX 75023

Stage Lighting Fixtures and Equipment for the Fine Arts Center
Post-Bid
Plano, TX

Electrical Maintenance
Results
Plano, TX 75023

Reported 05/01/2020 12:00 AM
Project Title

NTMWD Wylie WTP High Service Pump Station 2-1 2016 Electrical Improvements Phase II B

Physical Address View project details and contacts
City, State (County) Wylie, TX 75098   (Collin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $3,200,000 to $3,600,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include improvements to the electrical equipment at Rockwall/Farmersville Pump Station, adding adjustable frequency drives to two pumps at the High Service Pump Station 2-1, and add a second feeder to the Blower Building. The following is a brief summary of work: 1. Demolish existing RF-MVMCC 2. Refeed existing pumps from new starters installed inside existing spaces at new HSPS 2-1 MVMCC 3. Demolish PLC inside RF-HSPS 4. Demolish 480V MCC and refeed existing loads from MCC-8112-1 inside 2-1 Electrical Building. 5. Install two 4160V, 1500HP AFDs 6. Replace two 4160V motors at HSPS 2-1.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents