Similar Projects
Redwood Clayton Apartments
New Construction
Conception
Clayton, OH 45315

McEwen Townhomes
New Construction, Demolition - 148,000 SF
Conception
$10,000,000 CJ est. value
Dayton, OH 45459

The Flats at South Park - Phase II
New Construction
Design
$8,000,000 est. value
Dayton, OH 45410

Hallmark Meridian Preservation Apartments
Renovation - 186,000 SF
Design
$12,000,000 est. value
Dayton, OH 45406

Homefull Campus
New Construction - 41,800 SF
Post-Bid
Dayton, OH 45417

Repair Damage 64 Bragg Place Dayton Ohio - REBID
Renovation
Post-Bid
Dayton, OH 45417

DMHA Revere - RAD Rehabilitation
Renovation - 9,075 SF
Construction
$400,000 est. value
Dayton, OH 45419

Biltmore Towers
Renovation - 317,000 SF
Construction
$20,000,000 est. value
Dayton, OH 45402

ICP Luxury Apartment Community
New Construction - 10,000 SF
Pending Verification
Kettering, OH

Former Hutchings Station Property Redevelopment
New Construction, Renovation, Demolition
Conception
$50,000,000 to $75,000,000 est. value
Dayton, OH 45426

Trotwood Senior Lofts
New Construction - 40,000 SF
Design
$10,759,360 est. value
Dayton, OH 45426

Hempstead Landing Apartments
New Construction - 62,810 SF
Construction
$6,000,000 est. value
Kettering, OH 45429

Redwood Apartment Neighborhoods Multi-Family Development
New Construction
Conception
Miamisburg, OH

The Senior Village at Kettering Town Square
New Construction - 51,400 SF
Design
$7,900,000 est. value
Kettering, OH

The Monument
New Construction, Demolition - 34,641 SF
Construction
$26,800,000 est. value
Dayton, OH 45402

Reported 07/14/2022 12:00 AM
Project Title

Make Ready/Unit Turns - Authority Wide

Physical Address View project details and contacts
City, State (County) Dayton, OH   (Montgomery County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Greater Dayton Premier Management reserves the right to reject any or all proposals, or waive any informality in the bidding. No proposals shall be withdrawn for a period of one hundred twenty days of submission. GDPM seeks a pool contractors to prepare vacant units for occupancy. Site visits will not be conducted, contractors will provide pricing based on the number of bedrooms, square footage and type of structure (i.e. Apartment, Hi-Rises, Studios, Townhome, etc.). See Exhibit I. GDPM reserves the right to select multiple contractors for the completion of Make Ready/Unit Turns Authority Wide. If the contractor(s) selected are unable to fulfill the completed work by expected completion date. GDPM has the authority to assign Make Ready/Unit Turns Authority Wide Repairs to other contractor(s). The designated GDPM staff person(s) will assign each contractor(s) to a unit(s), along with an estimated timeline for completion. In the event additional work may be required, designated GDPM staff will walk the unit with contractor and request a quote/proposal from the contractor. GDPM will evaluate price reasonableness and scope detail. If applicable, prevailing wage must be included and outlined within the quote/proposal. All awardees shall be required to meet Affirmative Action requirements and Equal Opportunity requirements and must insure that all employees and applicants for employment are not discriminated against because of race, color, religion, national origin, disability, age, ancestry, creed, or military status.

Details

Apartments/Condominiums, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents