Similar Projects
White House Town Center
New Construction
Design
White House, TN 37188

Red River Road Townhomes
New Construction
Design
Gallatin, TN

Construction of Water System Improvements - Bay Point Lift Station Replacements
Demolition, New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Gallatin, TN 37066

Red River Court Infrastructure
New Construction
Post-Bid
Gallatin, TN 37066

Savannah Market West Retail Development
New Construction, Infrastructure - 24,000 SF
Post-Bid
$6,300,000 CJ est. value
Gallatin, TN 37066

Fire Station 5 Site and Drainage Improvements
Infrastructure
Results
Gallatin, TN 37066

Southern Force Main (Hester To Sage) Project
Infrastructure
Results
$989,836 CJ est. value
White House, TN 37188

31-W Townhomes
New Construction
Pending Verification
White House, TN 37188

Kensington Downs Phase 3
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Gallatin, TN 37066

Indian Lake Village Phase 3G
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Hendersonville, TN 37075

Station Camp High School Field House
New Construction, Infrastructure
Post-Bid
$34,667 CJ est. value
Gallatin, TN 37066

2020 Wastewater Treatment Plant Expansion
Addition, Demolition, Infrastructure
Results
$14,528,900 CJ est. value
Portland, TN 37148

Double Star Hotel
New Construction, Infrastructure - 71,876 SF
Pending Verification
$22,000,000 CJ est. value
Gallatin, TN 37066

Coles Ferry Road Duplex
New Construction
Design
$1,000,000 est. value
Gallatin, TN 37066

2 Bay Extension on Garage for Sumner County Sheriffs Office
Addition, Demolition, Infrastructure
Post-Bid
$400,000 CJ est. value
Gallatin, TN 37066

Last Updated 02/09/2023 09:41 AM
Project Title

Caldwell Place

Physical Address View project details and contacts
City, State (County) Gallatin, TN 37066   (Sumner County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $43,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a townhome development. As of February 9, 2023, this project is in the early planning stages, and has received recommendation of preliminary plat approval from the Gallatin Planning Commission. It has received recommendation of rezoning and final and preliminary master development plan approvals. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to third quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents