Similar Projects
North Star Outdoor Storage
New Construction - 217,808 SF
Conception
$500,000 est. value
Meridian, Star, ID 83669

Public Storage - Ten Mile Road / Meridian
New Construction
Conception
$3,000,000 est. value
Meridian, ID 83646

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Taylor Hall Stair Replacement Boise State University
Renovation
Bidding
$575,000 CJ est. value
Boise, ID 83706

Saturn Way Storage Condos
New Construction - 1,495,284 SF
Post-Bid
$10,000,000 CJ est. value
Boise, ID 83709

RFQ Construction Manager - College of Pharmacy Research Labs, Idaho State University, Pocatello, Idaho
Renovation
Post-Bid
$16,800,000 CJ est. value
Pocatello, ID 83201

Renovations, Upgrades, Labs Science Building
Renovation
Results
$1,450,000 est. value
Boise, ID 83725

Renovations of Various Admin Spaces and Roof Safety Rail
Renovation
Results
$450,200 est. value
Boise, ID 83712

Project Peregrine - FaceBook / Meta Data Center / Kuna
New Construction, Infrastructure - 960,000 SF
Construction
$800,000,000 CJ est. value
Kuna, ID 83634

Ann Morrison Park Drive / Multi Residential
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Boise, ID 83706

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Last Updated 03/09/2023 04:10 PM
Project Title

Boise State University ESI Construction Management Building

Physical Address View project details and contacts
City, State (County) Boise, ID 83706   (Ada County)
Category(s) Commercial, Education, Heavy and Highway, Laboratory
Sub-Category(s) College/University, Laboratory, Site Development, Vocational School, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a construction management facility to include office and laboratory space, technology class space, and high-bay structures to promote student learning. The project consists of a 30,000 square foot site development and a two-story 13,600 square foot lab facility and 2,600 square foot storage building. ESI Construction is requesting a base scope valuation & donation from subs/vendors. ESI requests all questions by 2-2-2023. We appreciate the continued interest in the BSU Construction Management Lab Building. This notification is to provide a few reminders on the project: 1. A Public Works License is NOT required since this project is privately funded. 2. Tax benefit information is located within the bid manual. 3. RFIs & Substitution Requests are due by February 2nd, 2023 by EOD. We appreciate the continued interest in the BSU Construction Management Lab Building. This notification is to provide a few reminders on the project: 1. A Public Works License is NOT required since this project is privately funded. 2. Tax benefit information is located within the bid manual. 3. RFIs & Substitution Requests are due THIS WEEK, February 2nd, 2023 by EOD. Addendum #1 has been issued as of 3-2-2023. The building is being named after the Meridian-based construction company ESI, as ESI has been working with BSU for decades to support internships and curriculum development for the construction management program at the university.

Details

,, 16,200 SF - 2 Stories Above Grade, 13,600 SF. 2,600 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware, Door Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents