Similar Projects
May Street Elevated Sidewalk Replacement
Infrastructure
Design
$1,508,000 CJ est. value
Hood River, OR 97031

Historic Columbia River Highway (HCRH): Mitchell Point Crossing
Infrastructure
Design
$21,549,000 CJ est. value
Hood River, OR 97031

Hood River-White Salmon Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$520,000,000 CJ est. value
Hood River, OR 97031

Avalon Drive Paving Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Hood River, OR 97031

Whiskey Creek - North Project
Term Contract
Results
$200,000 est. value
Dee, OR 97031

Hood River WWTP Digester Mixing System
Renovation, Infrastructure
Results
$2,972,000 CJ est. value
Hood River, OR 97031

Bridge of the Gods Trailhead Parking Project
Infrastructure
Construction
$496,487 CJ est. value
Cascade Locks, OR 97014

RFQ Contractor - Bonneville Test Lab Building
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Cascade Locks, OR 97014

May Street Townhouses
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Hood River, OR 97031

OR 281 at Orchard Road (Hood River)
Infrastructure
Design
$1,406,000 CJ est. value
Mount Hood Parkdale, OR 97041

RFQ Contractor - Bonneville Spillway Rock Removal FY23
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Cascade Locks, OR 97014

2 nd and Oak Intersection Improvements
Infrastructure
Results
$867,875 CJ est. value
Hood River, OR 97031

OR 281, OR282 and OR 35 Signs, Signals and Lighting
Infrastructure
Design
$811,876 CJ est. value
Hood River, OR 97031

Culbertson Drive Waterline
Infrastructure
Post-Bid
$597,000 CJ est. value
Odell, OR 97031

I-84: Ruckel Creek Culvert
Infrastructure
Design
$909,648 CJ est. value
Cascade Locks, OR 97014

Last Updated 06/26/2023 04:06 AM
Project Title

Culbertson Drive Waterline

Physical Address View project details and contacts
City, State (County) Mount Hood Parkdale, OR 97041   (Hood River County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $195,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, equipment, tools, materials and supervision to construct approximately 500 lineal feet of eight (8) inch diameter ductile iron waterline along Culbertson Drive, which includes one creek crossing. The work will include excavation, disposal of excess excavation, waterline pipe, dewatering (if necessary), pipe zone material, backfill, connecting to existing water mains, service lines, waterline creek crossing, surface restoration, valves, fittings, thrust restraint, compaction, pressure and bacteriological testing, and miscellaneous work and appurtenances. Project must be substantially complete in 45 calendar days. Questions and requests for clarification related to this Work shall be directed to the project engineer, Tom Ferrell, P.E., PACE Engineers, Inc., 4500 Kruse Way Suite 250, Lake Oswego, OR 97035. Phone: (503) 597-3222; email: tomf@paceengrs.com.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents