Similar Projects
Geotechnical Subsurface Explorations
Infrastructure
Bidding
$500,000 est. value
Angelica, Chemung, Chittenango, Schoharie, NY 14825

Geotechnical Subsurface Explorations
Infrastructure
Bidding
$500,000 est. value
Angelica, Chemung, Chittenango, Schoharie, NY 14825

Quick Set Slurry Seal - 2021-2022
Post-Bid
Elmira, NY

Pavement In-Place Recycling (2021-2022)
Term Contract
Post-Bid
NY

Highway, Culvert Maintenance Job Order Contract: Region 6
Results
Less than $800,000 est. value

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Concrete Box Culverts for Watercure Hill Road
Infrastructure
Bidding
Elmira, NY 14925

Pavement Reclamation (FDR) (2021-2022)
Term Contract
Post-Bid
NY

Cold Mix Pavements - 2021-2022
Results
Elmira, NY

Micro Surfacing 2021-2022
Term Contract
Post-Bid
NY

Culvert Construction (2021-2022)
Term Contract
Results
NY

Vendor Placed Pavement
Post-Bid
Elmira, NY

2021 HMA Pavement in Place Projects
Term Contract
Results
Big Flats, Elmira, NY

Cold Milling (2021-2022)
Term Contract
Post-Bid
NY

HMA Pavements for Chemung County and City of Elmira
Infrastructure
Results
Elmira, NY

Last Updated 05/31/2022 10:08 AM
Project Title

Regional Wastewater Treatment Plant (WWTP) Site Preparation Contract 2

Physical Address View project details and contacts
City, State (County) Elmira, NY 14904   (Chemung County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under this Contract includes, but is not limited to construction of a temporary access road to the site through an easement and placement of fill for surcharging under future Trickling Filters including the following: 1. Providing temporary erosion control measures. 2. Construction of temporary access road from existing Milton Street Plant site roads. 3. Stripping and stockpiling of topsoil on site. 4. Placement and compaction of imported fill for surcharging under future trickling filters including placing settlement monitoring gauges. 5. Survey services to record as placed fill and monitor settlement. C. Contracting Method: The Project shall be constructed under one prime Contract.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents