Similar Projects
Design Services for Refurbishment of Norge Elementary School
Renovation
Design
Williamsburg, VA 23188

Landscape Maintenance Services
Term Contract
Sub-Bidding
Williamsburg, VA 23185

Pest Management and Related Products and Services
Term Contract
Post-Bid
Stafford, VA 22554

Periodic Monitoring, Trapping, Pest Management, Chemical Products Application And Pest Removal Components of the Integrated Pest Management Program
Post-Bid

Unity Braxton Middle School Security Residence
New Construction - 988 SF
Results
Manassas, VA 20109

Bristow Run Elementary School Renovation and Addition
Renovation, Addition - 91,151 SF
Results
Bristow, VA 20136

Bray School Building Restoration
Renovation
Construction
$5,000,000 est. value
Williamsburg, VA

Portable Toilets For - Lake Shenandoah, Rockingham County, VA
Post-Bid
Harrisonburg, VA 22801

Warhill High School Auxiliary Gym Addition and Interior Renovations
New Construction, Renovation - 493,635 SF
Results
$3,485,500 est. value
Williamsburg, VA 23188

Grounds Maintenance, Landscaping And Snow Removal Services
Term Contract
Post-Bid

Architectural Services for Jamestown High School Cafeteria Expansion
Addition
Results
$221,000 to $2,278,000 est. value
Williamsburg, VA 23185

Annihilare Disinfecting Units, Satellites, Installation and Training for Tidewater Community College
Term Contract
Post-Bid

Toano Middle School Restroom Renovations
Renovation
Results
Toano, VA 23168

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Pressure Washing - Tidewater Community College
Term Contract
Post-Bid

Last Updated 08/05/2022 02:33 AM
Project Title

Bleacher Inspection, Maintenance and Repair

Physical Address View project details and contacts
City, State (County) Williamsburg, VA 23185   (James City County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Middle/Senior High School, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bleacher/Basketball Stop Wrestling Mat Holders & Gym Divider Curtain Inspection, Maintenance & Repair Services. Question Deadline 08/19/2022 at 12:00 PM ET Inquiries: Questions pertaining to this project should be directed to Linda Hodges, Senior Procurement Specialist at linda.hodges@jamescitycountyva.gov If the Contract is renewed beyond the initial one (1) year Contract period, the first option year, and each additional option year will be subject to a price increase. This increase will be determined by using the Consumer Price Index (DC-MD-VA-WV) All Urban Consumers as reported annually by the Bureau of Labor Statistics. The current rates will be increased by the same percentage of the CPI-U for the renewal period with the increase not to exceed five percent (5%). This price increase will not be automatic and must be mutually agreed upon at time of contract renewal.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents