Similar Projects
Water Main Replacement 2023 Project Bundle 2
Alteration
Bidding
Cincinnati, OH

Valley View and Tarrimore Water Line Project
Infrastructure
Bidding
$4,000,000 est. value
Middletown, OH

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Lawn and Jackson Water Main Replacement
Infrastructure
Bidding
$398,282 est. value
Bluffton, OH

Burtonville Water Force Main Materials
Post-Bid
Wilmington, OH

2020-C Water Main Renewal
Results
Less than $3,538,141 est. value
Cleveland, OH 44114

2021 Loudonville AMR Water Meter Replacement Project
Infrastructure
Post-Bid
$280,000 est. value
Loudonville, OH

Rebuild Test Structures at Lima, OH
Results
$1,000,000 to $5,000,000 est. value
Lima, OH 45801

South Union Road Roadway Improvements and Water Main Extension Project
Infrastructure
Post-Bid
Middletown, Monroe, OH 45044

Charlotte Mae Waterline Improvements
Results
Less than $88,451 est. value
Sardinia, OH 45171

Lead Service Line Replacement Phase 2
Infrastructure
Post-Bid
Bellaire, OH

Construction Inspection and Construction Administration Services Eastern Pressure District Waterline Upgrades
New Construction - 2,740 SF
Results
Less than $8,065,000 est. value
Springfield, OH 45502

Last Updated 05/06/2022 04:32 PM
Project Title

Raw Water Intake Improvements

Physical Address View project details and contacts
City, State (County) East Liverpool, OH 43920   (Columbiana County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,858,500
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this project partially involves work within the Ohio River and includes but is not limited to the following: removal of the existing raw water intake structure and replacement with two (2) passive intake screen systems including the corresponding hydroburst system & air lines, raw water intake conduit, valving permanganate lines, and other associated incidentals."Contract A" includes the installation of two (2) new passive intake screen systems including the corresponding hydroburst system & air lines, raw water intake conduit, valving, permanganate lines, and other associated incidentals; all as further described in the construction drawings. "Contract B" includes the removal of the existing raw water intake structure and corresponding incidentals; all as further described in the construction drawings.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents