Similar Projects
Robbins Elementary School HVAC Improvements
Alteration
Post-Bid
Trenton, NJ 08609

HVAC Maintenance at Trenton Water Works Distribution Complex
Term Contract
Post-Bid
Trenton, NJ 08638

Preventative Maintenance and Repair Services for Air Conditioning System
Alteration
Results
Trenton, NJ 08619

Green Hall HVAC Upgrades Project
Alteration
Results
Ewing, Ewing Township, NJ 08638

HVAC - All Regions
Term Contract
Post-Bid

Duct Cleaning
Term Contract
Results
NJ

Preventive Maintenance and Repair of HVAC Systems
Term Contract
Post-Bid
Trenton, NJ

Princeton High School (PHS) Cooling Towers Overhaul
Infrastructure
Results
$250,000 est. value
Princeton, NJ 08540

HVAC Repair and Equipment Replacement Services
Alteration
Post-Bid
$71,000 est. value
Hamilton Township, NJ

Mechanical Roof Top Unit Replacements for the Regional Day School
Alteration
Results
$680,000 est. value
Hamilton Township, NJ 08690

HVAC Repairs and Maintenance
Alteration
Post-Bid
Hamilton Township, NJ

Purchase and Installation of a Source Capture Exhaust Extraction System for All Front-line Apparatus
Renovation
Results
$215,000 CJ est. value
Ewing, NJ 08618

HVAC System Assessment Project
Alteration
Post-Bid
Trenton, NJ

Powerhouse BAC Cooling Tower Repairs 2nd Rebid
Renovation
Results
$261,715 CJ est. value
Ewing, NJ 08628

Maintain and Service the Heating, Ventilating and Air Conditioning (HVAC) Systems for Various Township Buildings
Term Contract
Post-Bid
West Windsor, NJ 08550

Last Updated 07/21/2023 08:02 AM
Project Title

ASB HVAC Unit Replacements

Physical Address View project details and contacts
City, State (County) Ewing, NJ 08618   (Mercer County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $162,240 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be bid as a Single Lump Sum. Start Construction in the field January 8, 2024 Final Completion in field, Substantially Complete February 9, 2024 A bid bond is required in the amount of 10% of the total bid. Bid bond shall consist of a certified check or cashiers check to the order of The College of New Jersey,The successful Bidder(s) is required to provide a Performance and Payment Bond equal to 100% of the contract. he College of New Jersey reserves the right to reject all bids or to waive any minor informalities in the bidding in accordance with law. Question Deadline 07/05/2023 at 4:00 PM ET Direct inquiries and correspondence relating to this proposal form and questions regarding the technical specifications and requests for clarification must be submitted in writing via email to manningl@tcnj.edu

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents