Similar Projects
High School and Elementary Cooling Retrofit
Alteration
Bidding
$850,000 est. value
Liberty Center, IA

Water System Improvements
Term Contract
Bidding
Storm Lake, IA 50588

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Bettendorf High School – Dust Collector Replacement
Alteration
Results
Bettendorf, IA 52722

Aquatic Center HVAC Replacement
Alteration
Results
North Liberty, IA 52317

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Ridgeway Towers Boiler Replacement
Alteration
Results
Waterloo, IA 50701

Chiller Replace - Roundy Elementary School
Alteration
Post-Bid
Columbus Junction, IA 52738

Removal and Replacement of Two Air Supply Units
Alteration
Results
$250,000 est. value
Davenport, IA 52801

CSD Indian Hills Junior High School - Boiler Replacement
Alteration
Post-Bid
Less than $425,000 est. value
Clive, IA 50325

Story County Justice Center HVAC Equipment Replacement Phase 2 and 3
Alteration
Results
Nevada, IA 50201

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Building S-34 Vehicle and Welding Exhaust Upgrades
Alteration
Results
Johnston, IA

Replacement of 126 Water Heaters
Alteration
Post-Bid
Corning, Creston, Lamoni, Lenox, Leon, Mount Ayr, Osceola, IA

Last Updated 12/17/2021 10:59 AM
Project Title

Washington CSD High School Mechanical Upgrades

Physical Address View project details and contacts
City, State (County) Washington, IA 52353   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes HVAC Improvements to the Existing high school located 1100 South B Avenue Washington IA 52353. The HVAC Improvements involves replacement of the Existing boiler heat System for the classroom section of the north wing with new mechanical rooftop units. additional interior improvements include fire sprinkler expansion to this wing,low voltage system, ceiling replacement, light Fixtures, framing drywalling, painting and asbestos abatement. Exterior work Includes roof Patching, Sheet Metal Patching, and Glazing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents