Similar Projects
Home2 Suites by Hilton / Columbia
New Construction, Infrastructure - 50,000 SF
Conception
$27,000,000 CJ est. value
Columbia, MO 65203

Applied Energy Services Adair County Solar Farm
New Construction, Infrastructure
Conception
$332,000,000 CJ est. value
Kirksville, MO 63501

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Forum Boulevard - Green Meadows to Nifong - 00653 - City of Columbia
Infrastructure
Design
$2,250,000 CJ est. value
Columbia, MO 65203

Pavement Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Cassville, MO 65625

Street Sealing for City of Laddonia
Infrastructure
Bidding
$273,000 CJ est. value
Laddonia, MO 63352

Forum Boulevard Improvements
Infrastructure
Post-Bid
$1,345,495 CJ est. value
Columbia, MO 65203

Radio Tower Erection Service - RKB Site
Infrastructure
Post-Bid
$400,000 est. value
Columbia, MO 65203

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

City Hall Basement Remodel - 201 South Franklin
Renovation
Results
Kirksville, MO 63501

Rolling Hills Library Savannah Branch Parking Lot & Retaining Wall
Infrastructure
Construction
$324,000 CJ est. value
Savannah, MO 64485

O'Reilly Auto Parts (CO5) #6643 / Columbia
New Construction, Infrastructure - 6,972 SF
Construction
$1,300,000 CJ est. value
Columbia, MO 65202

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Last Updated 06/29/2023 10:23 AM
Project Title

Build Two Additional Retaining Walls

Physical Address View project details and contacts
City, State (County) Rock Port, MO 64482   (Atchison County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $174,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor and material to construct two 5 tall walls, the first tier being 175 in length and the second tier being 100 in length. Walls will be constructed on a minimum 1 x 8 3/8 compacted base rock footing. Perforated drainage pipe shall be installed on the backside at the base of each tier for the entire wall length. Wall blocks shall be filled and backed with a minimum 1 of % rock with retaining fabric placed between soil and rock. The Commission reserves the right to refuse any or all bids. The County of Atchison is an Equal Opportunity Employer and invites the submission of proposals from minority and women-owned firms and DBE.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents