Similar Projects
Permanent Emergency Bypass Transmission Main on East Third Avenue (FY 2025-2026) - WA-04 - City of Foster City
Infrastructure
Conception
$300,000 est. value
Foster City, CA 94404

Gravity Mains along Mitten Avenue, Gilbreth, and Stanton - City of Burlingame
Infrastructure
Conception
$2,088,000 est. value
Burlingame, CA

Repair a Damage Storm Drain System and Rebuild Nearby Eroded Embankment
Infrastructure
Design
$1,092,000 est. value
Half Moon Bay, CA 94019

Mission Street Streetscape Improvements
Infrastructure
Bidding
$296,000 CJ est. value
Daly City, CA 94014

2022 Sanitary Sewer Root Foaming (South Basin)
Infrastructure
Bidding
$482,000 CJ est. value
San Mateo, CA 94401

2022 Sanitary Sewer Mains Cleaning and Video Inspection
Term Contract
Sub-Bidding
Hillsborough, CA 94010

2022 Sanitary Sewer Mains Cleaning and Video Inspection
Term Contract
Sub-Bidding
Hillsborough, CA 94010

Portable and Vault Toilets Services and Rentals
Term Contract
Post-Bid
San Francisco, CA

Handyman Service
Alteration
Post-Bid

General Building (B License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
New Construction, Renovation
Results
$5,000,000 est. value

Avenues Three and One Sewer and Water Main Replacement
Infrastructure
Results
San Bruno, CA

Gravity Mains along Alpine, Palm, Easton, Adeline, and Trousdale - City of Burlingame
Alteration
Conception
$2,103,000 est. value
Hillsborough, CA 94010

2022 Landfill Gas Collection System and Perimeter Leachate System Modifications for Bedwell Bayfront Park
Renovation, Infrastructure
Bidding
$1,230,000 CJ est. value
Menlo Park, CA 94025

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Daily City DMV Field Office
Term Contract, Infrastructure
Post-Bid
Daly City, CA 94015

2021-2022 Watermain Replacement Project - Brookline
Alteration
Results
$693,000 to $75,000 est. value
Redwood City, CA

Last Updated 08/04/2022 06:05 PM
Project Title

Closed Circuit Television Inspection - AREA 2 Project

Physical Address View project details and contacts
City, State (County) East Palo Alto, CA 94303   (Santa Clara County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will include the furnishing of all labor, materials and equipment, and other appurtenances for cleaning and inspecting approximately 33,000 lineal feet of sanitary sewer pipelines using closed circuit television (CCTV) methods and selected pipeline repairs as indicated in these contract documents, specifications, and drawings. The contract documents may be inspected at: the office of the East Palo Alto Sanitary District; San Francisco Builders Exchange, 850 So. Van Ness Avenue, San Francisco, California 94110; Peninsula Builders Exchange, 735 Industrial Road, Suite 100, San Carlos, California 94070; Santa Clara Builders Exchange, 400 Re ed Street, Santa Clara, California 95050; Builders Exchange of Alameda, 3055 Alvarado Street, San Leandro, California 94577; Construction Bidboard Incorporated, 11622 El Camino Real, Suite 100, San Diego, CA 92130; and Contra Costa Builders Exchange, 2440 Stanwell Drive, Suite B, Concord, California 94520. The District ("Owner") reserves the right to reject any or all bids and to determine which proposal is, in the judgment of the District, the lowest responsible bid of a responsible bidder or group of bidders and which proposal should be accepted in the best interest of the District. The District also reserves the right to waive any informalities in any proposal or bid. Bid proposals received after the time announced for the opening will not be considered. No bidder may withdraw their proposal after the time announced for the opening, or before award and execution of the contract, unless the award is delayed for a period exceeding forty-five (45) days. Pursuant to the provisions of Public Contract Code Section 22300, and upon the request and at the expense of the Contractor, securities equivalent to the amount withheld by the District to insure performance under the Contract may be deposited with the District, or with a state or federally chartered bank as escrow agent who shall deliver such securities to the Contractor upon satisfactory completion of the contract. Only those securities listed in Government Code Section 16430 or other securities approved by the District are eligible for deposit. The deposit of securities with an escrow agent or the District shall be made in the form and on such terms and conditions as the District may require to protect the interest of the District in the event of the Contractor's default. The Contractor shall be the beneficial owner of any securities that are deposited and shall receive any interest thereon. Pertaining to Sections 1770, 1773, and 1773.1 of the California Labor Code the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rates are on file at the District office of the East Palo Alto Sanitary District and which copies shall be made available to any interested party on request. The successful bidder shall post a copy of such determinations at each job site. In accordance with the provisions of California Public Contract Code Section 3300, the District has determined that the Contractor shall possess a valid Class A License or a combination of the Class C licenses indicated in Article B8.01-License Requirements, at the time that the contract is awarded. Failure to possess the specified license(s) shall render the bid as non-responsive and shall act as a bar to award of the contract to any bidder not possessing said license(s) at the time of award. Contractor's attention is directed to Section B8.18, Small Business and Subcontracting Participation Goal, which grants the Contractor a credit for using a Small Business Contractor, as defined in the section.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents