Similar Projects
Y--Florida Ditch and Canal Lining
Design
$1,000,000 to $5,000,000 est. value
Durango, CO

Highline Lake State Park - Wastewater Plant Expansion
Infrastructure
Bidding
$1,400,000 est. value
Loma, CO 81524

PKAA, Prayer 9 Project
Infrastructure
Bidding
CO

Interior and Exterior Pond Maintenance
Post-Bid
Lone Tree, CO 80124

Rockinghorse Filing 1 Drop Structure Replacement Project
Post-Bid
CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Marion Street System, Phase 1
Results
$6,500,000 to $7,200,000 est. value
Denver, CO

Root & Ratliff Salinity Control Pipeline Project
Infrastructure
Bidding
Mancos, CO

Denver Water - Eleven Mile Reservoir Outflow Flume Replacement
Post-Bid
Denver, CO

Chestnut Street to Eastman Park Drive Drainage Improvement Ph 1
Results
Less than $2,174,800 est. value
Windsor, CO 80550

Traffic Calming and Walkability Project
Infrastructure
Bidding
Edgewater, CO

HP and HDPE Storm Drainage Pipe for City Repair Projects
Term Contract
Post-Bid
Pueblo, CO

Olde Stage Road Slope Stabilization, Wall Construction and Box Culvert Install
Results
CO

Slip Line Culvert
Infrastructure
Bidding
Less than $1,000,000 est. value
CO

Alley Water Main Replacement Project
Post-Bid
Cedaredge, CO

Last Updated 08/05/2021 05:41 AM
Project Title

Jordan Road Underpass

Physical Address View project details and contacts
City, State (County) Parker, CO 80134   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $327,480
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of constructing a 120' X 14' X 10' single cell cast-in-place concrete box culvert (CBC) through an active section of Jordan Road just of Todd Drive. The new box culvert shall provide an alternate route to the existing at-grade crossing on Jordan Rd that serves the East/West Trail. In addition to the new box culvert, work generally consists of phased traffic control; CBMPs; asphalt demo and pavement; concrete demo, sidewalks and trails; curb and gutter; median restoration; earthwork; dry and wet utility relocations; lighting (inside CBC); chain link fence (atop CBC wing walls); painting (inside CBC); signage; striping and seeding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents