Similar Projects
Dever Golf Cart Sales and Service Center
New Construction, Infrastructure - 16,630 SF
Conception
$2,500,000 CJ est. value
Louisville, KY 40245

Publix Super Market at Marshall Commons / Louisville
New Construction, Infrastructure - 58,501 SF
Conception
$15,000,000 CJ est. value
Louisville, KY 40241

American Printing House for the Blind Renovation and Expansion / Louisville
Addition, Demolition, Renovation, Infrastructure - 57,000 SF
Design
$9,320,000 CJ est. value
Louisville, KY 40206

Holgate Apartments
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Louisville, KY 40210

Request for Qualifications-General Contractors
Infrastructure
Post-Bid
Louisville, KY

Central Park Sprayground
Infrastructure
Post-Bid
$500,000 CJ est. value
Louisville, KY 40208

Paving and Site Work
Term Contract
Results
Louisville, KY

Crescent Hill Pump Station Discharge System Improvements
Renovation
Results
$10,000,001 to $25,000,000 est. value
Louisville, KY

Louisville Industrial Center Building H
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Louisville, KY 40214

Norton Healthcare Hospital at Opportunity Campus
New Construction, Infrastructure - 60,000 SF
Construction
$70,000,000 CJ est. value
Louisville, KY 40211

Old New Cut Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Fairdale, KY 40118

Kristin's Quarter
New Construction, Infrastructure - 190,592 SF
Pending Verification
$193,000,000 CJ est. value
Louisville, KY 40229

Cedar Creek Apartments
New Construction, Infrastructure - 5,000 SF
Conception
$120,000,000 CJ est. value
Louisville, KY 40291

New Market Street Hotel
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Louisville, KY 40202

Riverport Tangent Loop Track
Infrastructure
Post-Bid
$200,000 CJ est. value
Louisville, KY 40202

Last Updated 12/29/2022 02:03 PM
Project Title

Morris Forman Water Quality Treatment Center (WQTC) Groundwater Dewatering System Automation

Physical Address View project details and contacts
City, State (County) Louisville, KY 40211   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,267,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description and location of Project: Project includes installation of new groundwater observation wells, installation of new level sensors, modification of existing groundwater pump discharge piping, and installation of controls for existing groundwater dewatering pumps at the Morris Forman WQTC as shown in the Project Drawings and Specifications. All work shall be done in accordance to MSD's Standard Specifications. The Engineer's Construction Cost Estimate for this project is between $ 1,000,000.00 and $ 1,600,000.00 . The Project Manager for this Invitation to Bid is Alex Novak. All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD's Project Manager, Alex Novak at alex.novak@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate "GOOD FAITH EFFORTS" in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) - see MSD MBE/WBE Program - Construction Subcontracting Goal Documents and Forms electronically. MSD SUPPLIER DIVERSITY PROGRAM: Applicable The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If selected as applicable above, the goals are as follows: 18.0% MBE - African American, 2.0% MBE - Asian-Indian American and 15.0% WBE - Caucasian Female participation respectively required for this project. MBE and WBE businesses are encouraged to bid on this project as a prime contractor. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's Project Manager, Alex Novak. The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline for questions is 5:00 PM EDT, Thursday, December 1, 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents