Similar Projects
Ditch Improvement 2122 Swancreek
Results
Less than $68,674 est. value
Wauseon, OH

Culvert Replacement
Results
OH

Fabric Concrete Bag Reventment
Results

Box Culverts
Results

Concrete Pipes
Results

Ditch Improvement 2131 Clinton Township
Results
Less than $4,015,129 est. value
Wauseon, OH

Slide Repair - IR275-2.62 (55.70)
Results

Ditch No. 2133 - Branch 2 Turkeyfoot Creek Drainage Improvement
Results
Less than $24,041 est. value
OH

German Township Road B Drainage
Results
Less than $187,000 est. value
Wauseon, OH 43567

Permanent Improvement Projects, Paving and Drainage
Results
Swanton, OH 43558

Ditch 2136-Rupp (Lowell)
Results
Less than $91,876 est. value
Wauseon, OH 43567

Culvert Invert Paving
Term Contract
Results

Ditch 2134-Royalton Township
Results
Less than $139,392 est. value
Wauseon, OH 43567

Box Culverts
Results

Concrete Pipes
Results

Last Updated 09/03/2019 04:05 PM
Project Title

Ditch Improvement 2137-Rupp(Doug)

Physical Address View project details and contacts
City, State (County) Wauseon, OH 43567   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,627
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This open ditch improvement project includes brush removal and disposal, large stump grinding, channel excavation and rock channel protection placement in German Township, Fulton County, Ohio.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents