Similar Projects
Bellaire Church Of Christ Parking Expansion
New Construction
Conception
Bellaire, TX 77401

McDonald Junior High School Addition
Addition
Conception
$20,876,963 est. value
Katy, TX 77449

Kroger #118-01 - Site Work Only
New Construction
Design
Spring, TX 77388

Cathedral High School
New Construction - 49,286 SF
Design
$19,700,000 est. value
Houston, TX 77055

Grand Prairie Mass Grading, Detention, and Dam Grading
Infrastructure
Bidding
TX

Breckenridge East Clearing and Grubbing Phase II
Infrastructure
Bidding
TX

Splendora High School Additions And Cte Additions
Addition - 30,700 SF
Post-Bid
Less than $8,115,000 est. value
Houston, TX

High School 12 project
New Construction - 499,295 SF
Post-Bid
Houston, TX 77000

Construction Services for Green Center Renovation
Renovation
Results
Less than $3,440,000 est. value
TX

Holbrook and Post Elementary School and Kahla Middle School Renovations
Renovation
Results
Less than $5,100,000 est. value
Houston, TX 77084

Construction Manager at Risk for System Upgrades and Renovations to Spring Woods High School
Renovation
Construction
Less than $25,000,000 est. value
Houston, TX

Construction Manager at Risk for Memorial High School Additions and Renovations
Renovation, Addition - 140,000 SF
Construction
$83,000,000 est. value
Houston, TX 77024

Awty Student Center Phase 2
New Construction
Pending Verification
$14,000,000 est. value
Houston, TX 77055

High School 3 Construction
New Construction
Conception
Tomball, TX

Yogasix
Renovation - 2,035 SF
Design
$230,000 est. value
Houston, TX 77345

Last Updated 12/16/2021 07:46 AM
Project Title

New Gym and Site Improvements at SST Excellence Campus

Physical Address View project details and contacts
City, State (County) Houston, TX 77060   (Harris County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Middle/Senior High School, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes: new construction of a free standing gym building, approx. 6,393 sf, playscape area, painting of the existing building, and site improvements. The new gym building will be a Pre-Engineered Metal Building System (PEMB) and is comprised of wall and roof panels, cold-formed metal framing, with metal stud interior walls and painted gypsum board walls generally as follows: - Roof consists of PEMB compatible metal roofing panels - Interiors - Associated site work includes; all paving and sidewalks (including all tie-ins to utilities), landscape, irrigation, underground utilities, storm drainage systems - MEP Systems - Relocation of existing playscape and provide new playscape and associated site improvements - Painting of the existing building facade - Landscaping - Concrete Building Foundation

Details

1 Middle/Senior High School, 6,393 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents