Similar Projects
2021 Preventive and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO 80202

Sand Traps - On-Call Single Trade Services
Post-Bid
Denver, CO 80202

Denver Coliseum Storm Drain Repair
Post-Bid
Denver, CO 80202

35th Street and Lincoln Park Sanitary Improvements
Results
Less than $2,015,784 est. value
Denver, CO 80202

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Balboa Park Sewer Rehabilitation
Post-Bid
Denver, CO

Interceptor Rehabilitation 2020 - 2022
Results
CO

Construction of the East 69th Avenue Forcemain
Post-Bid
Denver, CO 80229

General Storm Crestone Peak
Results
$2,000,000 to $2,450,000 est. value
Denver, CO

Non-Destructive Excavating, Potholing, Hydro-Jetting and Vacuuming
Post-Bid
Denver, CO 80204

Sewage Ejectors Ellie Caulkins
Results
Denver, CO 80204

FNS Sanitation System
Term Contract
Post-Bid
CO

High Point Possum Gully Sanitary Sewer
Results
Denver, CO

East 64th Avenue and Denali Street Infrastructure Project
Post-Bid
Denver, CO 80202

R3 S6 Sand Trap Cleaning
Results
Denver, CO 80204

Last Updated 02/10/2021 11:22 AM
Project Title

East 16th Avenue System, Phase 1

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,500,000 to $9,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is the first phase of an effort to extend and upsize the storm system in the Montclair Basin to relieve frequent and significant flooding in the neighborhood. The downstream end of the project will tie into an existing box in Jackson Street at East 17th Avenue that outfalls into Ferril Lake. The new storm drain will extend via a 9'x9' box east in East 17th Avenue to Colorado Boulevard. Tunneling will be required to cross under Colorado Boulevard. Work will also include a trash vault, full roadway reconstruction, full utility reconstruction, and improvements to the existing system on Batavia Place between Colorado Boulevard and Albion Street. Two alternates to the bid will continue the system east from Colorado Boulevard along East 17th Avenue to Albion Street and then south on Albion Street to Batavia Place.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents