Similar Projects
Thompson Center Redevelopment
New Construction
Conception
Chicago, IL 60601

Lake Effect Firehouse Brewery & Apartments
Renovation
Conception
$2,400,000 est. value
Chicago, IL 60630

Cassidy Place Mixed Use
New Construction
Design
$139,000,000 est. value
Chicago, IL 60654

400 Lake Shore Development
New Construction
Design
$1,000,000,000 est. value
Chicago, IL 60601

Otto Veterans Square in Chicago Heights
New Construction
Bidding
$23,000,000 est. value
Chicago Heights, IL 60411

Sarah`s On Lakeside
New Construction, Demolition - 25,535 SF
Bidding
$17,500,000 est. value
Chicago, IL 60640

Oak Park Central Pumping Station Drywall Repair and Painting
Post-Bid
Oak Park, IL 60302

Elevator Construction Package 13 - Task Order
Renovation
Post-Bid
Chicago, IL 60653

Lorraine Hansberry Renovation
Results
Chicago, IL 60644

Gymnasium Railing Replacement
Results
South Holland, IL 60473

The Avondale Townhomes & Condominiums
New Construction
Construction
Chicago, Schiller Park, IL 60176

CJE Senior Life Affordable Housing
Addition - 73,017 SF
Construction
Evanston, IL 60202

1150 West Lake Street Mixed Use Development
New Construction, Demolition - 47,000 SF
Pending Verification
$300,000,000 est. value
Chicago, IL 60642

NEMA Phase II
New Construction
Pending Verification
$200,000,000 est. value
Chicago, IL 60605

300 Block Development
New Construction
Conception
Oak Park, IL 60304

Last Updated 09/06/2021 04:52 AM
Project Title

Hattie Callner Interior

Physical Address View project details and contacts
City, State (County) Chicago, IL 60657   (Cook County)
Category(s) Residential, Single Trades
Sub-Category(s) Apartments/Condominiums, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Common area improvements at the Ground Floor level including a renovated Lobby and Reception Area, a new Computer Lab, a new office and new finishes at selected areas. The renovation will also entail MEP improvements that include the installation of new fan-coil units in each apartment and the installation of a new make-up air distribution system.

Details

Apartments/Condominiums, 17 Stories Above Grade, 90,762 SF Renovation, 146 Unit(s).
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents