Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Colfax Wastewater Treatment Plant Slope Stabilization
Term Contract
Design
Colfax, WI 54730

Fitchburg Inclusive Park Project Sitework
Infrastructure
Bidding
Fitchburg, WI

Potato River Road Flood Damage Repairs - Site 1
Infrastructure
Bidding
Odanah, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Minocqua - Manitowish, Trout River Culvert Replacement
Infrastructure
Bidding
WI

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Monico - Eagle River
Infrastructure
Bidding
WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Phase 1 Lamparek Creek Restoration
Infrastructure
Bidding
Mount Pleasant, WI

Last Updated 07/15/2021 10:53 AM
Project Title

2021 Burlington Drainage Projects CIP

Physical Address View project details and contacts
City, State (County) Burlington, WI 53105   (Racine County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid work for the above contract includes driveway replacement and paving an alley on E. Chandler Blvd, between S. Kane Street and Edward Street, construction of a new storm inlet in the backyards of 440 Jennifer Avenue and 441 Kendrick Avenue, and replacement of curb and storm sewer on Westridge Avenue. This work includes replacement of concrete pavement, curb and gutter, sidewalk, replacement of existing storm sewer, adding additional storm sewer, and new concrete pavement for an alley. Major work items and approximate quantities for which bids are requested include, 370 SY of concrete pavement, 100 SY of concrete driveway apron, 360 SF of 6-inch concrete sidewalk, 132 LF of concrete curb and gutter, and 120 SY of landscape restoration. An alternate bid will also be requested for paving of the alley off Chandler Blvd. with asphalt. These improvements include clearing and grubbing, new concrete curb and gutter, new concrete sidewalk, new concrete driveway aprons, storm sewer relay, storm sewer manholes/catch basins, sawing asphalt and concrete, excavation common, landscape restoration, traffic control, and erosion control.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents