Similar Projects
Penny Paws Animal Clinic
New Construction - 4,153 SF
Design
$600,000 est. value
DeSoto, TX 75115

Dog's Day Out
New Construction - 9,574 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Plano, TX

Construction: Animal Shelter Visitation Area Improvements
Bidding
McKinney, TX 75071

Animal Holding Facility II
New Construction
Bidding
$1,000,000 to $1,150,000 est. value
El Paso, TX

Repair Vet Treatment Facility, Brooke Army Medical Center, Fort Sam Houston, TX
New Construction, Renovation - 6,492 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
San Antonio, TX 78234

Kennel Renovations at Prairie Paws
Renovation
Post-Bid
Grand Prairie, TX 75052

Y--ARANSAS NWR Design Build
Results
$10,000,000 est. value
Austwell, TX 77950

National Fish Hatchery Modernization Assessment
Results
San Marcos, TX 78666

Canine Wellness Center
New Construction - 6,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
McKinney, TX 75070

Lakewood Veterinary Center
New Construction - 4,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dallas, TX 75214

PetSuites of America
New Construction - 10,911 SF
Design
$2,500,000 est. value
Richmond, TX 77407

Hurst Animal Shelter
Post-Bid
Hurst, TX 76054

Design/Build Proposals Animal Control Facility
Results
Less than $847,000 est. value
Anahuac, TX

PetSuites
New Construction - 11,000 SF
Construction
$2,000,000 est. value
Fort Worth, TX 76123

Camp Bow Wow
Build-Out - 6,530 SF
Design
$275,000 est. value
Cedar Hill, TX 75104

Last Updated 05/03/2021 08:51 AM
Project Title

Cameron Park Zoo New Hoofstock Barn

Physical Address View project details and contacts
City, State (County) Waco, TX 76707   (McLennan County)
Category(s) Animal/Plant/Fish Facility
Sub-Category(s) Animal/Plant/Fish Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of all labor, materials, equipment, appurtenances and incidentals as required to properly demolish and dispose of the existing facility including structure, foundations, paving and fencing as identified; and construct, complete and be accepted in place a replacement Hoofstock Barn structure per plans and specifications.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents