Similar Projects
Environmental Services IDIQ
Design

Quality Check Samples (Drinking Water and Wastewater Testing)
Post-Bid
Atlanta, GA 30303

Environmental Compliance & Conservation Services (ECCS MAIDIQ)
Post-Bid

Demolition of the Josephine Wells ES
Demolition
Results
Less than $213,510 est. value
Hapeville, GA 30354

Asbestos Abatement, Demolition and Debris Removal
Term Contract
Results
Atlanta, GA 30336

Internal Air Quality Testing Services
Post-Bid
GA

Demolition Project
Results
Milton, GA

Abatement, Remediation and Flood Response Services
Renovation
Post-Bid
Atlanta, GA

East Area Water Quality Control Facility (EAWQCF) Improvements
Results
Atlanta, GA 30303

Abatement and Demolition Services
Term Contract
Post-Bid
Sandy Springs, GA 30328

House Demolition and Removal
Demolition
Results
Johns Creek, GA 30097

Right of Way Property Management Demolition and Removal Services
Demolition
Post-Bid
Atlanta, GA 30308

Demolition of Sheraton Hotel Complex
Results
College Park, GA 30303

Abatement and Demolition Services
Demolition
Post-Bid
Sandy Springs, GA 30328

Exterior Demolition of Accessory Buildings-Former
Demolition
Results
Milton, GA 30004

Reported 06/04/2021 12:00 AM
Project Title

Interior Demolition and Abatement

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30303   (Fulton County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Demolition, Environmental
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of removing the interior finishes which include but are not limited to: Non-load bearing partition walls. Removing electrical wiring and fixtures and capping at the primary source. Plumbing pipes and fixtures and capping any plumbing. Heating, ventilation, and air conditioning (HVAC) units and ducts. Floor and ceiling furnishings (exterior doors and windows to remain).

Details

Division 02 - Existing Conditions, Demolition, Asbestos Remediation, Asbestos Abatement.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents