Similar Projects
RV OP 3 LP
New Construction
Conception
Horsham, PA 19044

Philmnt/Tomlinson/Pine Rd Int
Infrastructure
Conception
$11,880,000 CJ est. value
Lower Moreland Township, PA 19006

Bryn Mawr Avenue Development
New Construction, Build-Out, Demolition - 135,356 SF
Design
Bryn Mawr, PA 19010

Ardmore Piazza
New Construction - 300,000 SF
Design
Ardmore, PA 19003

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

2022 Infrastructure Improvement Project Group
Infrastructure
Post-Bid
$2,964,985 CJ est. value
Lansdale, PA 19446

Electrical Renovations - One Montgomery Plaza
Renovation
Results
Norristown, PA 19401

Taylor Farm Demolition Project
Demolition, Infrastructure
Results
Royersford, PA 19468

The Mayer
New Construction - 6,650 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Bala-Cynwyd, PA 19004

The Summit House
New Construction - 75,836 SF
Construction
$10,000,000 est. value
Jenkintown, PA 19046

Mancill Mill Road Apartments
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
King of Prussia, PA 19406

Rock Hill Road Mixed Used Development
New Construction, Build-Out, Demolition - 105,956 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Bala Cynwyd, Lower Allen, PA 19004

District Wide Bridge Rehab Group P
Infrastructure, Renovation
Conception
$8,129,000 CJ est. value
Schwenksville, PA 19473

AutoZone #5334 / East Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

Transportation Department Restroom Renovation Project
Renovation
Post-Bid
Blue Bell, PA 19422

Last Updated 11/28/2022 09:01 AM
Project Title

The Fairway Apartments / Abington

Physical Address View project details and contacts
City, State (County) Norristown, PA 19401   (Montgomery County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $92,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 3, 2022, the project is in final planning. The project received final approval from the Planning Commission for the City of Abington Township on February 11, 2021. No building permits have been submitted. Information regarding the architect and general contractor have not been disclosed. A construction timeline hasn't been confirmed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5 Stories Above Grade, New Construction, New Construction. 2 Stories Below Grade, Parking Spaces, 491 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents