Similar Projects
Storage Place
New Construction - 30,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Charlestown, RI 02813

Accessory Storage Structure
New Construction - 9,000 SF
Conception
Pawtucket, RI

True Storage Providence
New Construction - 82,659 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Providence, RI

The Beck Companies
New Construction - 54,447 SF
Design
$5,000,000 to $10,000,000 CJ est. value
North Smithfield, RI 02896

Bucklin Point Wastewater Treatment Facility Operations Building and Maintenance/ Storage Building
New Construction - 17,800 SF
Post-Bid
$30,000,000 est. value
East Providence, Providence, RI 02916

Public Storage - Plainfield Pike
New Construction - 122,242 SF
Post-Bid
$10,000,000 CJ est. value
Johnston, RI 02919

Construction of Fort Adams Maintenance Garage
New Construction
Results
$1,984,000 est. value
Newport, RI 02840

Salt Storage Fabric Building
Results
West Warwick, RI 02893

Cogent Capital Storage
New Construction - 150,000 SF
Construction
$10,000,000 CJ est. value
Providence, RI 02905

Wasatch Storage
Renovation - 91,710 SF
Construction
$2,100,000 est. value
Pawtucket, RI 02860

Steve's Bounce House
New Construction - 11,000 SF
Pending Verification
Less than $500,000 CJ est. value
Coventry, RI 02816

Self-Storage
New Construction - 2,250 SF
Pending Verification
North Providence, RI 02904

Warehouse/Distribution Space
New Construction
Conception
Central Falls, RI

South County Post & Beam
New Construction - 72,900 SF
Design
$1,000,000 to $5,000,000 CJ est. value
South Kingstown, RI 02892

Quonset Point Fuels Storage Complex Replacement Construction
Results
$5,000,000 to $10,000,000 est. value
North Kingstown, RI 02852

Last Updated 12/28/2021 09:19 AM
Project Title

Ledward Avenue Storage Units

Physical Address View project details and contacts
City, State (County) Westerly, RI   (Washington County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 20,600 SF New Construction, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents