Similar Projects
Lift Station 1-1 Valve Replacement
New Construction
Bidding
VA

Sweetbriar Sewer Pump Station Upgrades
New Construction
Bidding
Stafford, VA

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

Smith Farms Sanitary Sewage Pump Station
New Construction
Construction
$75,000 est. value
Yorktown, VA 23693

Pump Station 23 Service Area Phase 8
Post-Bid
Norfolk, VA

Construction of Arts and Conference Center Pump Station 114
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA 23456

Kings Trail Pump Station 234 Replacement
Post-Bid
Virginia Beach, VA

Oak Forest Pump Station Abandonment Project
Results
$959,491 est. value
Charlottesville, VA 22900

Langley School Pump Station and Force Main
Post-Bid
$3,400,000 est. value
McLean, VA 22101

Rady Park Pump Station Replacement
Results
Warrenton, VA

Construction of Lake Front Village Pump Station 309 Replacement
Post-Bid
Virginia Beach, VA 23456

Burton Station Sanitary Sewer Pumping Station #370
Results
$130,000 est. value
Virginia Beach, VA 23456

Reported 08/04/2021 12:00 AM
Project Title

Installation of the Big Fork Booster Station Expansion

Physical Address View project details and contacts
City, State (County) South Hill, VA   (Mecklenburg County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Big Fork Booster Station Furnish and erect a split face masonry building extension to the existing booster station building including removal of two (2) existing pumps and its controls, piping modification to the existing portion, installing four (4) new pumps, valves, piping, electrical, and controls installation. Furnish and install yard piping, valves, etc. at facility. Site work including grading, changes to the parking lot along with asphalt and seeding restoration at facility.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents