Similar Projects
South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

Treynor Family Recreation Complex
New Construction, Infrastructure
Design
$4,650,000 CJ est. value
Treynor, IA 51575

Cattlemen's Heritage Beef Processing Plant
New Construction, Infrastructure
Design
$54,000,000 CJ est. value
Council Bluffs, IA 51501

Wastewater Treatment Facility Upgrade
Build-out, Infrastructure
Bidding
$6,380,000 CJ est. value
Treynor, IA 51575

East Orchard Avenue Water Main Relocation
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Council Bluffs, IA 51503

First Avenue Trail Project -Trail Project
Infrastructure
Post-Bid
$2,000,000 est. value
Council Bluffs, IA 51501

HMA Resurfacing
Infrastructure
Results
IA

Hma Resurfacing
Infrastructure
Results
IA

Pollard Games Council Bluffs Expansion
Addition, Demolition, Infrastructure - 40,000 SF
Pending Verification
$9,400,000 CJ est. value
Council Bluffs, IA 51501

Valley View Sewer Rehabilitation - PW-27-10 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51503

Bahnsen Park Replica Baseball Field (Yankee Stadium) - PR-23-05 - City of Council Bluffs
Infrastructure
Design
$300,000 CJ est. value
Council Bluffs, IA 51501

450th Street Storm Sewer Improvements
Infrastructure
Post-Bid
$322,688 CJ est. value
Avoca, IA 51521

CBCSD Early Learning Center Overlot Grading
Infrastructure
Results
Council Bluffs, IA

30th Avenue Sewer Rehabilitation - Phase II - PW-24-08 - City Of Council Bluffs
Infrastructure
Conception
$750,000 CJ est. value
Council Bluffs, IA 51501

Last Updated 05/31/2023 03:29 PM
Project Title

Circle Drive Full Depth PCC Patching

Physical Address View project details and contacts
City, State (County) Council Bluffs, IA 51503   (Pottawattamie County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all bonds, proof of insurance, labor, materials, clean-up and guarantee to complete the full depth PCC patching along Circle Drive from the 4-way stop at the Student Center, to Visitor Lot 7. All material will be of professional grade and quality and will be installed according to manufacturer guidelines. Sawcut and remove approximately 21,000 sq. ft. of damaged concrete along Circle Drive as per attached map and installation of full depth PCC patching as per specifications below. Sawcut and remove approximately 975 lineal feet of damaged concrete curb and gutter along Circle Drive and installation of 2' wide typical concrete curb and gutter as per specification below. ALL FULL DEPTH PCC PATCHING SHALL BE PER SUDAS SPECIFICATION 7040, INCLUDING SUDAS FIGURES 7040.101 OR 7040.102. JOINTS SHALL BE PER SUDAS PV-101 Contractor Shall Saw Cut Existing Pavement Full Depth. The Pcc Patch Shall Be, at a Minimum, Existing Thickness +2". Dowels or Tie Bars Shall Be Used When Required by Sudas, Refer to Pv-101 for Sizing. All Dowels or Tie Bars Shall Be Epoxy Coated. All Pcc Pavement Mix Shall Be Idot Mix C-47b or C-47b-wr. A Liquid Curing Compound Shall Be Sprayed to a Continuous, Uniform Film on the Horizontal Surface and Vertical Edges Of Pavement, Curbs, and Back of Curbs Immediately After Surface Moisture Has Disappeared, but No Later Than 30 Minutes After Finishing. Concrete Shall Reach a Minimum Compressive Strength of 3,000 Psi Before Opening to Traffic. If Concrete Cylinders Are Not Obtained, a Minimum of 7 Days Shall Be Required Before Opening. A 5% bid bond is required. No bidder may withdraw their proposal within 60 days after the bid opening. A 100% Performance Bond and Payment Bond will be required. The work must be completed during normal business hours, Monday - Friday, 6:00 a.m. to 5:00 p.m. unless advance arrangements have been made with Travis Martin, Director of Facilities. The work may be started, June 5, 2023, and must be completed no later than July 31, 2023, unless an extension is agreed to by Iowa Western Community College. The Owner reserves the right to order the Contractor to remove any person from the work or property who the Owner determines to be in violation of federal, state or local laws, Owner policies or a threat to the safety of employees, other workers, visitors, or otherwise.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents