Similar Projects
Grade, Drain and Surface - IS 35
Infrastructure
Conception
$10,000,000 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Conception
$10,000,000 CJ est. value
Norman, OK 73069

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain, Bridge and Surface
Infrastructure
Design
$15,000,000 CJ est. value
Noble, OK 73068

Softball Field House and Development - Westmoore High School Selective Bid Packages
Demolition, New Construction, Infrastructure
Sub-Bidding
$4,500,000 CJ est. value
Oklahoma City, OK 73170

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Kunkle Valve Replacement
Alteration
Post-Bid
Norman, OK 73019

Sewer Force Main Improvements - HDPE Pipe and Plug Valve
Infrastructure
Results
Moore, OK

Porter Avenue Waterline Replacement Phase II
Infrastructure
Results
Norman, OK

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Utilities - US 77
Infrastructure
Conception
$1,000,000 est. value
Noble, OK 73068

Interchange - IS 35
Infrastructure
Design
$20,000,000 CJ est. value
Norman, OK 73069

Horizontal Directional Drilling
Infrastructure
Post-Bid
Norman, OK

Moore Animal Shelter - Bid Package #1
New Construction, Infrastructure - 47,629 SF
Results
$6,492,069 CJ est. value
Moore, OK 73160

Last Updated 09/26/2022 08:46 AM
Project Title

I-44 - Utilities

Physical Address View project details and contacts
City, State (County) Norman, OK 73026   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $885,851 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I-44: From Just South of 89th Street, North to 0.5 Mi North of 89th Street (Ut for (04)) As of September 26, 2022, the project is in conceptual status. Anticipated letting month/year is June, 2023. Length : 0.750 Mi. OKDOT - I-44 - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents