Similar Projects
Electrical Supplies and Lighting (Line Item)
Alteration
Post-Bid
KY

Electrical Contractor Services
Term Contract
Post-Bid
Louisville, KY

Electrical Services
Term Contract, Alteration
Results
Louisville, KY

MFWQTC FEPS Loadcenter and MCC Replacement
Alteration
Results
$500,000 to $700,000 est. value
Louisville, KY 40211

Airfield Vault Rehabilitation and Medium Voltage Switchgear Replacement
Alteration
Post-Bid
Louisville, KY 40209

Raw Water Generator Pad and Chemical Feed Improvements
Alteration
Results
Wellington, KY

Lighting Maintenance District 5
Alteration
Post-Bid
Louisville, KY

FFWQTC Power Factor Correction
Alteration
Results
$166,302 to $203,258 est. value
Louisville, KY 40245

LED Board Purchase and Install
Alteration
Post-Bid
Louisville, KY

Entertainment Lighting
Alteration
Results
Louisville, KY 40214

Electrical Contractor Services
Alteration
Post-Bid
Louisville, KY

Signs-Lighting-Signals
Infrastructure, Alteration
Results
$200,000 est. value
Louisville, KY

Two (2) Year Contract for Street Lighting Maintenance for the Westbank Harry Lee Expressway for the Jefferson Parish Engineering Department
Term Contract
Post-Bid
Kenner, LA 70065

Electrical Service
Term Contract
Post-Bid
Louisville, KY 40202

Purchase of Aluminum Sign Blanks
Term Contract
Post-Bid
Louisville, KY 40202

Last Updated 02/02/2023 03:32 PM
Project Title

New Fan Installation Jefferson Community & Technical College Tech B

Physical Address View project details and contacts
City, State (County) Louisville, KY 40202   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $112,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide and install high-volume, low-velocity (HVLS) and wall-mounted convective cooling fans as indicated for automotive shops. Fans require new circuitry, a new branch panelboard and associated feeder for connection to the existing power distribution system. All wiring and controls for fans shall be included for a turn-key system. Fans shall be tied to existing fire alarm system as required by all applicable codes. Service End : 4/29/2023

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents