Similar Projects
Padmount Switchgear
Bidding
Farmington, NM 87401

Hot Line Maintenance
Post-Bid
Farmington, NM

Water Treatment Plant Emergency Generator
Post-Bid
Bloomfield, NM

Electrical Connectors
Term Contract
Results
Farmington, NM

San Juan County McGee Park Coliseum and Site Electrical Upgrades-Phase 3
Results
Farmington, NM

NIIP Block 4, 6 and 7 Power Factor Corrections
Post-Bid
Farmington, NM

Switches, Disconnects, Reclosers and Sectiontionalizer, and Padmount Switchgear
Results
Farmington, NM

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Wood Distribution Poles
Results
Farmington, NM

Solar Paneled Carports
Post-Bid
Farmington, NM

115KV Upgrade Hare to Dwight Arthur Substation
Results
Farmington, NM

N--NIIP Block 4, 6 & 7 Power Factor Correct
Post-Bid
$1,000,000 to $5,000,000 est. value
NM

Generator Step-Up Transformer for Bluffview
Results
Farmington, NM 87401

BIE/NMNN/FACMGT/3-Generators
Post-Bid
Fruitland, NM 87416

1000 KVA 3 Ph Padmount Distribution Transformer
Results
Aztec, NM

Reported 06/20/2019 12:16 AM
Project Title

Substation Batteries and Installation

Physical Address View project details and contacts
City, State (County) Aztec, NM 87410   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Installation of new batteries and disposal of old batteries. Remove existing batteries and replace with new batteries. Contractor is responsible for disposal of old batteries. Provide scope of work details for installation with quote.
Details
Division 26 - Electrical, Battery Equipment, Batteries.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents