Similar Projects
Repplier Park Camera Installation Project
Renovation
Design
$200,000 CJ est. value
Banning, CA 92220

RFP - Riverside Transmission Reliability (RTRP) Consultant Services
Term Contract
Post-Bid
Riverside, CA 92522

67-12 KV Oil-Filled Transformer University T4 and LA Colina T2
Term Contract
Post-Bid
Riverside, CA 92522

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Results
$750,000 to $950,000 est. value
Palm Springs, CA 92264

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Generator Installation
Renovation
Construction
$2,028,300 CJ est. value
Hemet, CA 92543

As Needed Electrical Repairs for City Facilities and LLMDs
Term Contract
Post-Bid
Coachella, CA 92236

Electrical Maintenance and Installation Services
Alteration
Results
Palm Springs, CA 92262

Generator Preventive Maintenance and As-Needed Repair Services
Term Contract
Post-Bid
Temecula, CA 92590

Replacement of the Helipad Landing Lights
Alteration
Results
Riverside, CA 92522

Holiday Lighting Design and Installation
Term Contract
Post-Bid
Coachella, CA 92236

Gibraltar Drive Cable Replacement Project
Infrastructure, Alteration
Results
$481,000 est. value
Riverside, CA

Di-Electric Switches
Term Contract
Post-Bid
Riverside, CA 92522

Indio Juvenile Hall Security Camera System Replacement
Renovation
Results
$584,105 CJ est. value
Indio, CA 92201

Electric Materials for Central Stores Annual
Term Contract
Post-Bid
Riverside, CA 92522

Last Updated 06/16/2023 10:21 AM
Project Title

Electric Vehicle Charging Station Infrastructure Installation Services

Physical Address View project details and contacts
City, State (County) Riverside, CA 92507   (Riverside County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide Electric Vehicle Charging Station infrastructure installation services for the EDD facility located at 1180 Palmyrita Avenue, Riverside, CA 92507.Electric Vehicle Charging Station Infrastructure Installation Services Term: August 1, 2023 through June 30, 2024 For individuals who need assistance due to a physical impairment, the EDD will provide a reasonable accommodation upon request for the mandatory walkthrough or site inspection. An individual who needs a reasonable accommodation must call Howard Hicks at (310) 418-5784 to arrange for a reasonable accommodation no later than the fifth working day prior to the scheduled date and time of the mandatory walkthrough or site inspection.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents