Similar Projects
Water Meter Boxes and Lids
Term Contract
Post-Bid
Raleigh, NC 27602

Jordan Lake Water Reclamation and Reuse Project Phase 2
Post-Bid
Raleigh, NC

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

State Street Water and Sewer Improvements Phase I Project
Results
Raleigh, NC

North Carolina DHHS Campus Phase 1 Motor Fleet Management Utilities Relocation
Infrastructure
Construction
Raleigh, NC

2021 Water Main Replacement Project
Post-Bid
Cary, NC

2020 Waterline Replacements
Results
Fuquay-Varina, NC

Upper Pigeon House and Five Points Water and Sewer Replacement
Post-Bid
Raleigh, NC

Salem Street Water Main Rehabilitation
Results
Apex, NC

Trinity Creek - Phase 4
Post-Bid
Apex, NC 27539

Burma Drive Extension
Results
Apex, NC

2020-2021 Waterline Extensions
Infrastructure
Post-Bid
Fuquay Varina, NC 27526

E.M. Johnson WTP - LS Pump 3 and 4 Service Hydraulic Improvements and Service
Results
Less than $300,000 est. value
Raleigh, NC 27614

Design Build Services for Friendship Public Utilities
New Construction, Infrastructure
Post-Bid
Less than $15,000,000 est. value
Holly Springs, NC

Galvanized Water Service Line Replacement II (Formal)
Infrastructure
Results
Raleigh, NC

Last Updated 02/23/2022 09:20 AM
Project Title

Galvanized Water Service Line Replacement I

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27605   (Wake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,412
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists generally of the following major items: 1. Replacement of 248 galvanized water service lines with copper pipe. The method for replacement is a trenchless method preferred by the Owner and is described in the specifications and provided video. Replacements are across the Raleigh service area. Work also includes identification of the private side of the service line while replacing the meter setter. Location See Document Page No: 3 to 8.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents