Similar Projects
Downtown Facade Project - Phase IV - 5010-11 - City of Oskaloosa
Renovation
Conception
$900,000 CJ est. value
Oskaloosa, IA 52577

3rd Floor Remodel - 315548 - City of Cedar Rapids
Renovation
Conception
$300,000 est. value
Cedar Rapids, IA 52401

2022 Ambulance Shed
Renovation
Design
$300,000 CJ est. value
Ackley, IA 50601

City Proactively Replacing Meter Interface Units
Renovation
Design
$100,000 CJ est. value
Dubuque, IA 52001

ADDS 2023 Administration Building Addition
Addition, Demolition, Infrastructure - 2,290 SF
Bidding
$658,000 CJ est. value
Burlington, IA 52601

Site 2 - 30 Acre Cell Improvements
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Marion, IA 52302

RFQ Contractor - Dallas County Admin Building - BP-07.01 Roofing and Exterior Metal
New Construction, Infrastructure
Sub-Bidding
$450,000 CJ est. value
Adel, IA 50003

RFQ Contractor - Dallas County Admin Building - BP-04.01 Masonry and Joint Sealants
New Construction, Infrastructure
Sub-Bidding
$940,000 CJ est. value
Adel, IA 50003

Owner Occupied Rehabilitation
Renovation
Post-Bid
Keokuk, IA

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Administration Building South First Floor Restrooms
Renovation
Results
Clinton, IA 52732

Tiffin Public Works Building
New Construction, Renovation - 33,610 SF
Results
Tiffin, IA

Old Engine House Office Renovation
Renovation - 5,400 SF
Construction
$219,765 CJ est. value
Dubuque, IA 52001

City Park - City of Alta
Infrastructure, Renovation
Pending Verification
$475,600 CJ est. value
Alta, IA 51002

Water Administration Building HVAC Improvements - 6250105 - City of Cedar Rapids
Renovation
Conception
$1,600,000 CJ est. value
Cedar Rapids, IA 52402

Last Updated 05/02/2023 03:49 PM
Project Title

DPS P09 Interior Renovation

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA 50613   (Black Hawk County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of selective demolition and finish work at the DPS building. The Iowa Department of Administrative Services will be receiving bids for Interior Renovations at DPS P09 1510 W 1st St. Cedar Falls, Iowa 50613. PROJECT 9334.00 Project Description: Interior Renovations. Direct all inquiries to the construction manager. The Iowa Department of Administrative Services anticipates construction to begin on April 11 th, 2023 and end on July 26th, 2023.] 1. The Contractor's Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor's Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractor's scope. 2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement. 3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place. 4. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager. 5. Contractor shall provide all equipment and tools for Contractor's own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner's operations, and at the discretion of the Construction Manager. 6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor's scope shall be repaired or restored to proper conditions by the Contractor. 7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor's Scope of work. Addendum #1-#3 have been issued as of 3-27-2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents