Similar Projects
2 New Parking Areas with Lighting and Landscaping
New Construction
Sub-Bidding
$50,000 to $70,000 est. value
New Brunswick, NJ 08901

Primary School Parking Lot Reconstruction at the South River School District
Post-Bid
South River, NJ 08882

Repair to Campus Walkways and Roadways
Post-Bid
Edison, NJ 08818

Sidewalk Repair Program to Include Curbs, Driveways and Handicap Ramps
Results
Piscataway, NJ 08854

East William Street Proposed Pathway and Parking Lot Improvements
Results
$247,831 est. value
Woodbridge, NJ 07095

Carteret Waterfront Walkway
Post-Bid
Carteret, NJ 07008

Municipal Complex Parking Lot Improvements - Contract 2
Results
Piscataway, NJ 08854

Parking Lot Construction Project District Headquarters Building
Post-Bid
Monroe Township, NJ 08831

Bus Parking at High School North
Results
$100,000 est. value
Plainsboro, NJ

Administration Building Parking Lot Renovations
Post-Bid
Perth Amboy, NJ 08861

Arts District Streetscape Improvements Phase II
Results
Carteret, NJ

Municipal Building ADA Ramp Improvement
Post-Bid
Helmetta, NJ 08828

Parking Lot Reconstruction Phase 3 at Pisctaway Campus
Results
Piscataway, NJ 08854

Plainsboro Road Bike Path Improvements
Post-Bid
Plainsboro, NJ 08536

Pulda Farm Walking Trail Improvements
Results
North Brunswick Township, NJ 08902

Last Updated 08/19/2021 04:46 PM
Project Title

2021 Sidewalk Improvement Project

Physical Address View project details and contacts
City, State (County) Rahway, NJ   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes one (1) base bid and (1) alternate bid that consist of removal and replacement of sidewalk that has been lifted or damaged by tree roots in the City of Rahway. The base bid and alternate bid include approximately 170 SY of concrete sidewalk. The project includes the following work to accommodate the sidewalk replacement and repair damage created by tree roots: full depth asphalt repair, concrete curb, concrete curb with gutter, steel tree plate, asphalt apron, concrete apron, tree removal, stump grinding, stump removal and restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents