Similar Projects
UNH Morse Hall - Elevator Improvements
Results
Durham, NH 03824

PSU Draper and Maynard - Fourth Floor Renovation
Renovation
Results
Andover, NH 03265

The Arthur L. Irving Institute for Energy and Society
New Construction - 55,000 SF
Construction
$60,000,000 est. value
Hanover, NH 03755

Holderness School Math & Science Academic Building
New Construction - 35,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Plymouth, NH 03264

Dartmouth College Hopkins Center for the Arts
Addition
Pending Verification
$70,000,000 est. value
Hanover, NH 03755

CM Philbrook Dining Hall - Bathroom and Locker Room Renovations
Renovation
Results
Durham, NH 03824

UNH Paul Creative Arts Center Construction of New Elevator
Results
Durham, NH 03824

Parsons Hall Classroom Renovation
Renovation
Results
Durham, NH 03824

Elliott Alumni Center - 1925 Room Renovation
Renovation
Results
Durham, NH 03824

UNH Holloway Commons Conference Area Carpeting Replacement
Renovation
Results
Durham, NH 03824

LNA/LPN Lab Renovations at River Valley Community College
Renovation - 740 SF
Results
Less than $50,000 est. value
Lebanon, NH 03766

Renovations for a Welding Lab at Great Bay Community College
Renovation
Results
Rochester, NH 03867

Kingsbury Hall CEPS Career Center
New Construction
Results
Durham, NH 03824

Design/Build Services for UNH Health Sciences Simulation Center
New Construction - 21,000 SF
Results
Durham, NH 03824

UNH Morse Hall - Winds Chamber Lab Fit-Up
Results
Durham, NH 03824

Last Updated 07/02/2020 02:54 PM
Project Title

Kitchen Renovations at White Mountains Community College

Physical Address View project details and contacts
City, State (County) Berlin, NH 03570   (Coos County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of but not limited to, a renovation of a kitchen area, furnish and install kitchen equipment, including a walkin Freezer and renovating an existing walkin. The Project will include but not be limited to the Disciplines of: Concrete construction, Electrical, Mechanical and Plumbing work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents