Similar Projects
Remove Six Dam Structures (Design/Build Project)
Bidding
$5,000,000 to $20,000,000 est. value

Remove Six Dam Structures (Design/Build Project)
Bidding
$5,000,000 to $20,000,000 est. value

Central Business District Tunnel Lighting and Conduit Replacement
Post-Bid
Pittsburgh, PA 15222

FE Walter Dam, White Haven - PA, Inspection and Repair of Right Service Gate in Tower
Post-Bid
$250,000 to $1,000,000 est. value
White Haven, PA 18661

Capitol Complex - Central Plant Steam Tunnel Repairs
Results
Less than $1,800,000 est. value
Harrisburg, PA

Marquette Lake Dam - Improvements to Marquette Lake Dam
Results
Less than $8,500,000 est. value
Harrisburg, PA

20 Dam Repairs at Various Locations in Western and Central Pennsylvania
Renovation
Bidding
$1,000,000 est. value
Harrisburg, PA 17105

Repair of Lake Swiftwater Dam
Renovation
Post-Bid
Henryville, PA 18332

Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Results
$500,000 to $1,000,000 est. value
PA 19320

Dam Repairs - Promised Land Dam
Bidding
$25,000 to $50,000 est. value
Greentown, PA

Capitol Complex Central Plant Steam Tunnel Repairs - General Construction
Post-Bid
$500,000 to $600,000 est. value
Harrisburg, PA 17100

Sand Springs Dam D52-177 Replacement of Outlet Vault and Valve
Results
PA

Construct Temporary Causeway Susquehanna River Inflatable Dam at Sunbury
Bidding
$100,000 to $500,000 est. value
Northumberland, PA

Meadow Grounds Lake Dam
Results
$2,000,000 to $5,000,000 est. value
McConnellsburg, PA

3-Year Maintenance Contract for Neshaminy Flood Control Dams
Term Contract
Results
PA

Last Updated 10/22/2020 10:41 AM
Project Title

Stoplog & Bulkhead Fabrication, Delivery, Installation and Testing

Physical Address View project details and contacts
City, State (County) Leesport, PA   (Berks County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract for work that consists of fabricate, delivery, installation and testing of Stoplogs to the Blue Marsh Lake dam in Leesport PA, and Bulkhead to the Beltzville Lake Dam in Lehighton, PA. Work to be performed (base plus 2 options) will include Base Bid: a) Fabricate one (1) new stoplog for Blue Marsh Lake Dam in accordance with all applicable codes and requirements. b) Inspect and certify all welded and non-welded connections in the new stoplog. c) Perform the initial inspection and provide documentation of findings from the initial inspection in report form. Report format to be in accordance with the contract requirements. d) Paint new stoplog in accordance with contract requirements. e) Deliver new stoplog to project site (Blue Marsh Lake Dam). f) Perform test-fit of new stoplog to ensure proper fit within the stoplog slots and proper seating. Option 1: a) Fabricate two (2) new stoplogs for Blue Marsh Lake Dam. One of the two additional stoplogs would be an ‘A’ stoplog while the other would be a ‘B’ stoplog in accordance with all applicable codes and requirements. b) Inspect and certify all welded and non-welded connections in the new stoplogs. c) Perform the initial inspection and provide documentation of findings from the initial inspection in report form. Report format to be in accordance with the contract requirements. d) Paint new stoplogs in accordance with contract requirements. e) Deliver new stoplogs to project site, Blue Marsh Lake Dam, Leesport, PA. f) Perform test-fit of new stoplogs to ensure proper fit within the stoplog slots and proper seating. Option 2: a) Fabricate one (1) new emergency gate bulkhead for Beltzville Lake Dam in accordance with all applicable codes and requirements. b) Inspect and certify all welded and non-welded connections in the new bulkhead. c) Perform initial inspection of new bulkhead and provide documentation of findings in report form. Report format to be in accordance with the contract requirements. d) Paint new emergency bulkhead in accordance with contract requirements. e) Deliver the new emergency gate bulkhead to the Beltzville Lake Dam, Lehighton, PA. f) Perform test-fit of new emergency gate bulkhead to ensure proper fit within the bulkhead slots and proper seating. The material used for construction of all stoplogs and the bulkhead will be ASTM A709 Grade 50 steel.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents