Similar Projects
SR-114 and 2000 North (MP 3.82), Provo
Infrastructure
Bidding
$500,000 to $1,500,000 est. value
UT

Redwood Road Trails Phase 2
Infrastructure
Bidding
Saratoga Springs, UT

Rotomill and Pave SR226
Post-Bid
UT

2021 Provo City Streets Road Rehabilitation
Post-Bid
Provo, UT

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

2020 Road Maintenance Projects
Results
Less than $46,601 est. value
Saratoga Springs, UT

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

Otteson Subdivision Street Improvements
Alteration
Pending Verification
Salem, UT 84653

Road Project Crack Seal Treatment
Infrastructure
Bidding
Highland, UT 84003

2021 Roads Project
Post-Bid
Lehi, UT

2020 Manhole Collar Repair Project
Results
Less than $104,650 est. value
Saratoga Springs, UT

2022 Provo City Road Rehabilitation Project
Infrastructure
Bidding
Provo, UT

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

700 South Overlay Project
Results
Less than $300,000 est. value
Pleasant Grove, UT 84062

Saratoga Springs Foothill Boulevard Extension-Lariat to Pony Express Parkway
Infrastructure
Bidding
Saratoga Springs, UT 84045

Last Updated 03/04/2022 10:20 AM
Project Title

Mill Road Roundabout

Physical Address View project details and contacts
City, State (County) Spanish Fork, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

City anticipates using a CM/GC delivery procurement method for this Project and expects to select the CM/GC at 30% Design. Civil Science, Inc. has been retained as the project Engineers and has been tasked to assist the City in the selection of a CM/GC. It is anticipated that The CM/GC will provide multiple detailed construction estimates during the design phase and an itemized Guaranteed Maximum Price (GMP) at the 100% construction drawing level (refer to the Anticipated Schedule). A roundabout was laid out at the intersection to determine the major impacts of the project. The 30% plan is posted on Bidsync. Truck turning templates were completed for all turning movements at the proposed roundabout at the Mill Rd. / 1100 South intersection. A WB-67 was used as the design vehicle. A WB-67 is able to make every right-turn, left-turn, and through movement at the roundabout. Mill Rd. / 1100 South intersection The intersection is currently a “T” intersection but will be a 4 legged intersection in the near future. The roundabout will be designed as a 4 legged roundabout. A center median curb on 1100 South in front of ALA will be done as part of the project. This will help with the school traffic. Here are some of the main items of this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents