Last Updated | 08/19/2020 05:24 AM |
Project Title | Ralston Water Treatment Plant Fluoride System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Arvada, CO 80007 (Jefferson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work generally consists of the installation of one fully functioning fluoride feed system, including screw feeder, tanks, mixer, transfer pump, feed pumps, and associated electrical, controls, and instrumentation. The work includes: A. Installation of an Owner furnished dry feed system, including a hopper, volumetric screw feeder, wetting cone, load cell, eductor, flow control valve panel, and dust collector B. Furnishing and installing mixing tank, mechanical mixer, feed tank, transfer pump, fluoride feed pump, valves, piping, and appurtenances. C. Furnishing and installing electrical equipment including motor controllers, PLC control panel, power and control wiring, duct banks, level sensors, and flow meter. Work will include furnishing, installation, and programming of new PLC and operator interface terminal and programming modifications to existing PLC and plant SCADA system. D. System training for the Operators and Maintenance staff. Please propose # of hours in the submission. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |