Project Title | Waupun Central Generating Plant (CGP) Water System Improvements - MEP |
Physical Address | View project details and contacts |
City, State (County) | Waupun, WI 53963 (Dodge County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,142,843 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is being let using the single prime bidding and contracting process. DFD will publicly bid the24 applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 525 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each26 applicable MEP division of work. These successful MEP bids must be included in all general prime27 contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will28 publicly open general prime contractor bids. General prime contractor bids that do not include the29 successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified,30 responsible, certified general prime contractor and this general prime contractor will enter into subcontracts31 with the successful MEP bidders. In general the work consists of the construction of a water treatment plant for radium removal including a horizontal pressure filter for radium removal, masonry building, electrical, plumbing and HVAC; electrical and process improvements at existing well buildings #3 and #4, underground utilities including boring and jacking below a railroad, and related asphalt, concrete and turf restoration Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing19 wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. The MEP Subcontractor scope of work is identical to the General Prime Contractor 39 scope of work included in these bidding and contract documents. By submitting and signing a bid, 40 all bidders have examined all of the Bidding Documents listed in the Table of Contents of the project 41 specifications. The successful bidders will be required to do all work which is shown on the 42 drawings, mentioned in the specifications, or reasonably implied as necessary to complete the 43 division of work bid for this project. Bid Results - Plumbing - North American Mechanical, Inc - $ 99,850.00 HVAC - Rohde Brothers, Inc - $ 124,000.00 Pieper Electric, Inc. - Electrical - $ 918,993.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |