Similar Projects
Cross Connection Devices
Bidding
Denver, CO

Advance Metering Infrastructure (AMI) System
Bidding
Thornton, CO

Wise Binney Connection Pipeline
Post-Bid
$19,000,000 est. value
Aurora, CO 80111

2020 Sacwsd Water System Removal and Replacements Phase 1
Post-Bid
Commerce City, CO

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

36-Inch Gun Club Rd. Pipeline from E. 26th Ave. to E. 56th Ave
Results
$7,500,000 to $8,100,000 est. value
Aurora, CO 80012

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70
Results
$2,800,000 to $3,000,000 est. value
Aurora, CO 80012

Aurora Reservoir Above Water 72-Inch Vault - 72" Valve
Post-Bid
Aurora, CO

Reported 04/14/2020 12:00 AM
Project Title

Buckley AFB, Co - Repair & Replace Fire Hydrants

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide and install seven (7) new fire hydrants and fire hydrants isolation valves: Work includes the installation of new fire hydrants and service valves, as well as replacement of water valves throughout the base. Related work includes removal and repair to pavements, curbs and gutters, and sidewalks. Cathodic protection will be provided and installed on all new valves, hydrants, pipe, and megalugs.

Details

Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Facility Fire Hydrants.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents