Similar Projects
Barkley Extension - City of Albany
Infrastructure
Conception
$969,354 CJ est. value
Albany, GA 31705

North Washington Extension - City of Albany
Infrastructure
Conception
$250,000 CJ est. value
Albany, GA 31701

Oglethorpe Bridge / SR 520 BU at Flint River
Demolition, New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Albany, GA 31705

SR 91 From SR 234 to Lee County Line
Infrastructure
Design
$5,000,000 CJ est. value
Albany, GA 31701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Lamar Reese Elementary School Sign
Infrastructure
Bidding
$150,000 CJ est. value
Albany, GA 31701

Pointe River Apartments
New Construction, Infrastructure - 65,985 SF
Sub-Bidding
$11,000,000 CJ est. value
Albany, GA 31721

Widening on SR 133
Infrastructure
Post-Bid
$43,353,383 CJ est. value
Albany, GA 31705

Diesel Equipment & Auto Collision Repair Center
New Construction, Infrastructure - 21,026 SF
Post-Bid
$7,000,000 CJ est. value
Albany, GA 31701

Driskell Park 1021 South McKinley Street
New Construction, Infrastructure
Results
$6,978,521 CJ est. value
Albany, GA 31701

Driskell Park 1021 South McKinley Street
New Construction, Infrastructure
Results
$6,978,521 CJ est. value
Albany, GA 31701

Albany State University Nursing and Health Science Simulation Lab Facility
New Construction, Infrastructure - 20,000 SF
Construction
$8,000,000 CJ est. value
Albany, GA 31705

Jefferson Street Living and Learning Center
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Albany, GA 31701

Chehaw Improvements - City of Albany
Renovation, Infrastructure
Conception
$330,930 CJ est. value
Albany, GA 31701

SR 520 From E of CR 473 / Pine Bluff Road to Piney Woods Creek
Infrastructure
Design
$2,000,000 CJ est. value
Albany, GA 31705

Last Updated 03/21/2023 04:22 PM
Project Title

Well 19 - City of Albany

Physical Address View project details and contacts
City, State (County) Albany, GA 31701   (Dougherty County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete Renovation of Well 19 building and well to bring this site up to EPD standards, renovation will include new pump and motor, cleaning of the well screens and installation of new column pipe and shaft. The building would have the electrical upgraded and the chemical rooms separated to meet EPD standards. Project is included City of Albany FY 2023 - 2027 CIP. As of March 21, 2023, a design team has not been identified. A construction timeline has not been established yet. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents