Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Creason Pathway Construction
Infrastructure
Post-Bid
Meridian, ID

Dust Abatement Dirt Roads
Term Contract
Post-Bid
Dixie, Elk City, Meridian, ID 83525

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Landfill NRC3 Lift C Horizontals Materials Purchase
Infrastructure
Post-Bid
ID

Capital Maintenance Phase Two
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Last Updated 09/02/2022 04:05 PM
Project Title

Spring Valley Water Storage Reservoirs No.1 and No.2

Physical Address View project details and contacts
City, State (County) Meridian, ID 83642   (Ada County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In accordance with the plans and specifications, this work shall consist of the construction of two, one million gallon concrete storage tanks for the Spring Valley Phase 1 Water System. Work includes approximately 4,700 LN FT (Total) of permanent access roads to with gravel and asphalt surfacing, retaining walls, storm drain placement and erosion control, concrete driveway and curb placement, topsoil stripping and stockpiling, site earthwork, grading and fencing of each site, and construction of water tanks including structural, mechanical, electrical, control, piping, valving, drains and other water system appurtenances at each site. Project Has an Expected Duration of 270 Calendar Days. Instructions to Bidders For All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. Bids Must Be Accompanied by Bid Security in the Form of a Bid Bond, Certified Check, Cashiers Check or Cash in the Amount of 5% of the Amount of the Bid Proposal. Said Bid Security Shall Be Forfeited to Spring Valley Community Infrastructure District as Liquidated Damages Should the Successful Bidder Fail to Enter Into Contract in Accordance With Their Proposal as Specified in the Instructions to Bidders. Spring Valley Community Infrastructure District Reserves the Right to Reject Any or All Proposals, Waive Any Nonmaterial Irregularities in the Bids Received, and to Accept the Proposal Deemed Most Advantageous to the Best Interest of Spring Valley Community Infrastructure District .

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents