Similar Projects
2021 Sewer Line Rehabilitation Project
Bidding
Clifton, CO 81520

2021 Preventative and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO

Denver Coliseum Storm Drain Repair
Post-Bid
Denver, CO 80202

Cherry Creek Interceptor Project
Post-Bid
Parker, CO

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

Cherry Creek Interceptor Project - Trenchless Construction Portion
Post-Bid
Parker, CO

2019 Ridge Road Storm Sewer Project
Results
Less than $248,850 est. value
Littleton, CO 80120

CR Water Projects Request for Pre-qualifications
Post-Bid
Castle Rock, CO 80104

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Pipe Lining Projects
Results
Colorado Springs, CO 80903

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

Last Updated 12/23/2019 05:53 PM
Project Title

Storm Drainage Rehabilitation and Improvements

Physical Address View project details and contacts
City, State (County) Longmont, CO 80501   (Boulder County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE: This is a storm sewer replacement project that includes work at two separate locations (Main Street, 17th Avenue). Schedule I consists of Main Street (US 287) Storm Sewer Improvements between 17th Avenue and 20th Avenue. The work includes removal and plugging (flow-fill) of existing storm sewer pipes, installation of new reinforced concrete pipe, inlet and manhole construction, pavement and site restoration. Schedule II consists of 17th Avenue Storm Sewer Improvements between Main Street (US 287) and Corey Street. The work includes removal and plugging (flow-fill) of existing storm sewer pipes, installation of new reinforced concrete pipe, inlet and manhole construction, mechanical lowering of water line, pavement and site restoration. The Contractor shall supply all labor, materials, equipment and incidentals necessary to complete the work in accordance with the project plans and specifications.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents