Similar Projects
SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Fire Hydrant Flow Testing
Results
Cincinnati, OH

Redevelopment of Hollister Development Site
Infrastructure
Results
Cincinnati, OH

St Columban Community Center
Addition, Infrastructure - 15,373 SF
Construction
$4,000,000 CJ est. value
Loveland, OH 45140

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

Goshen Township Road 74 Resurfacing Project
Infrastructure
Post-Bid
Goshen, OH

Interchange- CLE 32-3.50
Infrastructure
Results
Clermont County, OH

Nestle Purina Wet Food Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Union Township, OH 45103

Water Main Replacement 2023 Project Bundle 3
Alteration
Post-Bid
Cincinnati, OH

Road Line Striping
Term Contract
Results
$728,960 est. value
Cincinnati, OH

Goshen Township Fire Station
Infrastructure
Post-Bid
$492,671 est. value
Milford, OH 45150

Last Updated 04/28/2023 11:31 AM
Project Title

Loveland Miamiville Sidewalk, Phase 1

Physical Address View project details and contacts
City, State (County) Loveland, OH 45140   (Clermont County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $264,089 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installing sidewalk along the east side of Loveland-Miamiville Road from Sugar Tree to Oakland Avenue in Loveland. Additionally, storm will be installed. Project Manager: Troy A. Niese Final Completion Date: October 27, 2023

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents