Similar Projects
Marlborough Emergency Pump Station Connection
Bidding
$713,800 est. value
Marlborough, MA

Hemlock Street, Proctor Street and Bridle Path Pump Stations Replacement - General Bids
New Construction
Bidding
$2,631,538 est. value
Worcester, MA 01606

Amherst-Pelham Regional Middle School Pump Room
Renovation
Post-Bid
Amherst, MA 01002

Construct New West Peabody Pump Station - Sub Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Sewage Lift Station Replacement
Results
Less than $250,000 est. value
Boston, MA

Permanent COMM Connection Project
Results
$334,000 est. value
Hyannis, MA 02601

Downtown Area Collection System and Pumping Stations
Construction
$13,000,000 est. value
Orleans, MA 02653

Cobb Street Pump Station Improvements
Renovation
Bidding
Norton, MA

Construct New West Peabody Pump Station - General Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Rose Park Pump Station Upgrades - General Bids
Results
$637,688 est. value
Pittsfield, MA 01201

Maintenance of Sewer Pumping Stations
Renovation, Term Contract
Bidding
$190,000 est. value
Danvers, MA

Rose Park Pump Station Upgrades - Filed Sub-Bids
Post-Bid
Less than $592,000 est. value
Pittsfield, MA 01201

Fiske Hill Water Pump Station Construction Project - General Bids
Results
$730,000 est. value
Sturbridge, MA 01566

Sewer Pump Station Maintenance and Repairs
Post-Bid
Lexington, MA

South End Sewer Pump Station Replacement
Results
$3,400,000 est. value
Fall River, MA 02722

Last Updated 07/23/2021 10:09 AM
Project Title

IP Mills Pump Station and Sewer Force Main

Physical Address View project details and contacts
City, State (County) Erving, MA   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $370,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of installation of approximately 750 linear feet of high-density polyethylene sewer force main, a precast concrete packaged wastewater pump station including pumps and controls, flow meter and associated valve vault, propane generator and tank, site fencing, connection to the existing gravity sewer system, and surface restoration.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents