Similar Projects
Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Kay Beller Park to BNSF Loop Trail - City of Whitefish
Infrastructure
Conception
$2,100,000 CJ est. value
Whitefish, MT 59937

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure - 27,000 SF
Design
$12,000,000 CJ est. value
Kalispell, MT 59901

Good Medicine Drive Pavement Maintenance
Infrastructure
Bidding
$1,100,000 CJ est. value
Whitefish, MT 59937

Armory Park Master Plan - Phase III
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Whitefish, MT 59937

Armory Park Master Plan - Phase III
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Whitefish, MT 59937

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Lake McDonald Utility Relocation
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Kalispell, MT

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

406 Spa and Coffee Shop Expansion
Addition, Demolition, Infrastructure - 2,277 SF
Construction
$600,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Three Rivers Bank
New Construction, Infrastructure - 6,300 SF
Pending Verification
$1,000,000 CJ est. value
Whitefish, MT 59937

Rose Crossing West Improvements - City of Kalispell
Infrastructure
Conception
$2,347,071 CJ est. value
Kalispell, MT 59901

East 2nd Street Hotel
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Whitefish, MT 59937

Last Updated 07/10/2023 03:33 AM
Project Title

Install and Connect Water Wells

Physical Address View project details and contacts
City, State (County) Kalispell, MT 59901   (Flathead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid is cancelled MT-CRESTON NFH-WATER WELLS - 1 Mobilization/Demobilization, Bonding, Overhead, & Profit 2 Well and appurtenances 3 Electrical components 4 Gate Valve 5 Connect to Existing System 6 Waterline 7 Pump Test 8 Water Quality Test 9 Existing Well Seal The magnitude of the project is between $250,000 and $500,000 with a budget towards the middle range of the magnitude. The total performance period is 100 calendar days from the issuance of the notice to proceed. The project is offered as a Total Small Business set-aside, NAICS Code is 221310 Water Supply and Irrigation Systems with a size standard of $36M. All questions regarding subject requirement shall be submitted in writing (via email) to the U.S. Fish and Wildlife, attention Mr. Tim Officer, 134 Union Blvd, Lakewood CO 80228. Period of Performance: 05/29/2023 to 08/31/2023 MBE (2.7%), WBE (6.9%), SBE (100%)

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents