Similar Projects
Maple Street Neighborhood Water Main Replacement
Bidding
Hudson Falls, NY 12839

2021 Water Main Lining and Lead Service Replacement
Bidding
$1,981,000 est. value
Rochester, NY

Water Hydrants, Pipe and Valves
Post-Bid
Jamestown, NY 14701

Hot Water Supply Repair
Post-Bid
Binghamton, NY 13904

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Hyde Park Phase 2 Water Meter
Results
Poughkeepsie, NY

Tilden Street Water Main Project
Bidding
Watertown, NY 13601

Emergency Repair Contract
Term Contract
Post-Bid
Niagara Falls, NY 14304

Seybolt Avenue Watermain Replacement Project Phase 5
Results
Otisville, NY 10963

Water System Improvements
Bidding
Hancock, NY

East Main Street Water Main Installation
Post-Bid
Endicott, NY 13760

Campbell Avenue Pipe Replacement
Results
Troy, NY 12180

Water Maintenance Materials
Bidding
NY

Furnishing and Delivering of Water System Materials
Post-Bid
Endicott, NY 13760

Water Main Replacement Project WTP to Devoe Road Tanks
Results
Less than $1,300,000 est. value
Mechanicville, NY 12118

Reported 12/16/2020 12:00 AM
Project Title

Steam Boiler Repair - USMMA O'Hara Hall

Physical Address View project details and contacts
City, State (County) Kings Point, NY   (Nassau County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This statement of work describes the diagnostic and repair services for the steam boiler #2 and lead lag panel located at O’Hara Hall located at the USMMA. The USMMA campus consists of 82 acres along the Long Island shoreline, about 50 buildings, waterfront structures and facilities, berthing of vessels and small craft and athletic fields. The primary purpose of this statement of work is for the contractor to provide repair services for steam #2 and lead lag panel located at O’Hara Hall. Boiler #2 is a steam boiler manufactured by Weil McClain. The contractor must have a minimum of 10 years of experience installing and servicing Weil McClain boilers and associated burner controls. The boilers serve steam for domestic hot water, heating water and heating the indoor pool required to train the midshipmen at the USMMA.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers, Water-Tube Boilers.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents